background image

• Never touch uninsulated telephone wires or terminals unless the telephone line is disconnected at the

network interface.

• Use caution when installing or modifying telephone lines.

• Remove power cables from all installed power supplies before opening the chassis.

Always follow these electrostatic discharge (ESD) prevention procedures when removing and replacing
modules:

• Ensure that the router chassis is electrically connected to ground.

• Wear an ESD-preventive wrist strap, ensuring that it makes good skin contact. Connect the clip to an

unpainted surface of the chassis frame to channel unwanted ESD voltages safely to ground. To guard
against ESD damage and shocks, the wrist strap and cord must operate effectively.

• If no wrist strap is available, ground yourself by touching a metal part of the chassis.

For the safety of your equipment, periodically check the resistance value of the anti-static strap. It should be
between 1 and 10 megohms (Mohm).

Caution

Site Requirements

Follow the general precautions listed below when installing or working with your device:

• Do not block cooling vents.

• Route system cables, and the power supply cable and plug so that they cannot be stepped on or tripped

over. Be sure that nothing else rests on your system component cables or power cable.

• If you turn off your system, wait at least 30 seconds before turning it on again to avoid system component

damage.

This product relies on the building’s installation for short-circuit (overcurrent)
protection. Ensure that the protective device is rated not greater than: 20A
Statement 1005

Warning

To prevent the system from overheating, do not operate it in an area that exceeds
the maximum recommended ambient temperature of: 40 degrees C. Statement
1047

Warning

Temperature, humidity, altitude, and vibration can affect the performance and reliability of the chassis. After
installation, ensure that the site maintains the environmental characteristics shown in this table:

Preparing for Installation

3

Preparing for Installation

Site Requirements

Содержание 5100

Страница 1: ...roduct This warning symbol means danger You are in a situation that could cause bodily injury Before you work on any equipment be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents Use the statement number provided at the end of each warning to locate its translation in the translated safety warnings that accompanied this device...

Страница 2: ...ccident occurs you can quickly turn off the power Disconnect all power before doing the following Installing or removing a chassis Working near power supplies Look carefully for possible hazards in your work area such as moist floors ungrounded power extension cables frayed power cords and missing safety grounds Do not work alone if hazardous conditions exist Never assume that power is disconnecte...

Страница 3: ...hould be between 1 and 10 megohms Mohm Caution Site Requirements Follow the general precautions listed below when installing or working with your device Do not block cooling vents Route system cables and the power supply cable and plug so that they cannot be stepped on or tripped over Be sure that nothing else rests on your system component cables or power cable If you turn off your system wait at...

Страница 4: ...70 inches 32 258 cm Width 10 0 inches 25 4 cm Depth 6 6 lbs 2 99 kg Weight To place the system in a proper location it is necessary to know the dimensions of the device s chassis The Cisco 5100 ENCS can be placed on a desktop or installed in a rack The mounting ears for the device are designed for 12 24 UNC screws The location of your device and the layout of your equipment rack or wiring room are...

Страница 5: ...8 meter electrical power cord Network Cabling Specification Ethernet cables for RJ45 ports Serial or console cables used to connect devices like routers Shielded USB cables with properly terminated shields for the USB port Required Tools and Equipment You will need the following equipment to install the device and its equipment ESD preventive cord and wrist strap Phillips screwdrivers small 3 16 i...

Страница 6: ...Preparing for Installation 6 Preparing for Installation Required Tools and Equipment ...

Отзывы: