
A-1
Hardware Installation Guide for Cisco 4000 Series Integrated Services Routers
OL-32185-02
A P P E N D I X
A
Online Insertion and Removal and
Hot-Swapping
The online insertion and removal (OIR) operation lets you replace faulty data and voice modules without
affecting system operation. The OIR is similar to hot-swapping. OIR commands are issued before
removing and after installing a module. When performing OIR, use an identical module to replace an
original one. If you need to perform OIR on multiple modules within a router, perform the operation one
module at a time.
The difference between hot-swapping and OIR is that OIR requires performing Cisco IOS commands
before and after the OIR. Hot-swapping is strictly a hardware function and requires no commands. Not
all router components or modules use OIR, or can be hot swapped.
The following components use OIR in the routers:
•
Service Modules (SMs)
•
Network Interface Modules (NIMs)
•
SFPs
•
USB devices
The following components can be hot swapped:
•
Fan tray
•
Power supply—only when the router is backed up with an optional PSU
Requirement
To issue OIR commands, you must keep the module that is to be replaced in EnergyWise full-power
mode. If the module is in EnergyWise power-saving or shutdown mode, you cannot issue OIR
commands, and you cannot, therefore, remove the module.
Содержание 4221 ISR
Страница 10: ...Contents x Hardware Installation Guide for Cisco 4000 Series Integrated Services Routers OL 32185 02 ...
Страница 16: ... xvi Hardware Installation Guide for Cisco 4000 Series Integrated Services Routers OL 32185 02 Chapter ...
Страница 18: ... xviii Hardware Installation Guide for Cisco 4000 Series Integrated Services Routers OL 32185 02 Chapter ...