
6-56
Hardware Installation Guide for Cisco 4000 Series Integrated Services Routers
OL-32185-02
Chapter 6 Install and Upgrade Internal Modules and FRUs
PoE Converter Power Supply Unit
Figure 6-41
Install or Remove PoE Fillers
Install the PoE Converter Power Supply
To install the PoE converter power supply:
Step 1
Remove the bezel and fan try from the router chassis. See
Step 2
Remove the PoE converter power supply filler. For instructions, see
Step 3
Open the slot latch before inserting the PoE converter power supply module.
Step 4
Rotate latch to close it.
Step 5
Tighten the screws on the module to secure it to the router chassis.See
for details.
Remove PoE Converter Power Supply
To remove the PoE converter power supply:
Step 1
Remove the bezel and fan try from the router chassis.
Open the slot latch. See
for details.
Step 2
Remove the PoE converter power supply module.
2
1
6
4
5
3
391819
1
Install tab into slot on chassis
2
POE filler being installed in PoE slot 0
3
PoE filler shown installed in PoE slot 1
4
PoE slot 1
5
Rotate to secure screw into securing nut in
chassis
6
PoE slot 0
Содержание 4221 ISR
Страница 10: ...Contents x Hardware Installation Guide for Cisco 4000 Series Integrated Services Routers OL 32185 02 ...
Страница 16: ... xvi Hardware Installation Guide for Cisco 4000 Series Integrated Services Routers OL 32185 02 Chapter ...
Страница 18: ... xviii Hardware Installation Guide for Cisco 4000 Series Integrated Services Routers OL 32185 02 Chapter ...