
Chapter 2 Installation
Preparing for Installation
2-8
Catalyst 2900 Series XL Hardware Installation Guide
78-6461-04
•
Mounting kit containing these items:
–
Four rubber feet for mounting the switch on a table, shelf, or desk
–
Two mounting brackets
–
Four number-12 Phillips machine screws for attaching the brackets to a
rack
–
Four number-8 Phillips flat-head screws for attaching the brackets to the
switch (19-inch rack mount)
–
Four number-8 Phillips truss-head screws for attaching the brackets to
the switch (24-inch rack mount)
–
One cable guide and one (two for modular switches) black Phillips
machine screw for attaching the cable guide to one of the mounting
brackets
Note
The cable guide does not attach to the Catalyst 2912 LRE XL and
2924 LRE XL switches.
•
One RJ-45-to-DB-9 adapter
•
Cisco Information Packet, containing warranty, safety, and support
information
Note
In addition to these items, the Catalyst 2924M XL DC switch also ships with a
DC terminal block plug on the switch back panel. (See
Figure 1-13
.)
Содержание 2900 - Catalyst Expansion Module
Страница 4: ......
Страница 10: ...Contents x Catalyst 2900 Series XL Hardware Installation Guide 78 6461 04 ...
Страница 88: ...Chapter 2 Installation Where to Go Next 2 44 Catalyst 2900 Series XL Hardware Installation Guide 78 6461 04 ...
Страница 162: ...Index IN 8 Catalyst 2900 Series XL Hardware Installation Guide 78 6461 04 ...