2-9
Cisco 1721 Router Hardware Installation Guide
78-13834-02
Chapter 2 Installation
Verifying Your Installation
Figure 2-4
Connecting the Power Supply
Step 2
Connect one end of the separate power cord to the socket on the power supply.
Step 3
Connect the other end of the separate power cord to a power outlet.
Step 4
Press the router power switch to ON ( | ).
Step 5
Confirm that the router has power by checking that the PWR LED on the front
panel is on.
Verifying Your Installation
You can verify that you have correctly installed the router by checking the
following LEDs:
•
PWR (front panel)—On when power is being supplied to the router.
SEE MANUAL BEFORE INSTALLATION
DSU
56K
CD
AL
LP
RD
TD
FDX
LINK
100
WIC0O
K
WIC1O
K
MOD OK
CONSOLE
AUX
Model
Cisco 1
721
10/100 ETHERNET
+5, +12, -12
VDC
Power supply
Power socket
65530