Chapter 2 Installing the Cisco 1700 Router
2-10
Cisco 1700 Router Hardware Installation Guide
78-5405-03
Verifying Your Installation
You can verify that you have correctly installed the router by checking the
following LEDs:
•
PWR (front panel)—On when power is being supplied to the router.
•
OK (front panel)—On when the router software is loaded and functional.
Blinking means that the router is performing a power-on self-test (POST).
•
WICØ/WIC1 OK (rear panel)—On when a WAN interface card is correctly
installed in the corresponding WAN interface card slot.
•
ETH ACT (front panel)—Blinking when there is network traffic on the local
Ethernet LAN.
•
WICØACT or WIC1 ACT (front panel)—Varies depending on the WAN
interface card installed. Refer to
Table 1-3
in the
“Cisco 1700 Router
Overview”
chapter.
•
LNK (rear panel)—On when the router is correctly connected to the local
Ethernet LAN through the 10/100 ETHERNET port.
Содержание 1700 series
Страница 4: ......
Страница 8: ...Contents viii Cisco 1700 Router Hardware Installation Guide 78 5405 03 ...
Страница 32: ...Chapter 1 Cisco 1700 Router Overview 1 12 Cisco 1700 Router Hardware Installation Guide 78 5405 03 ...
Страница 48: ...Chapter 2 Installing the Cisco 1700 Router 2 16 Cisco 1700 Router Hardware Installation Guide 78 5405 03 ...
Страница 62: ...Appendix A Technical Specifications A 2 Cisco 1700 Router Hardware Installation Guide 78 5405 03 ...