Chapter 6 Maintaining the Router
Removing and Replacing the Blower Module
6-10
Cisco 12006 and Cisco 12406 Router Installation and Configuration Guide
OL-11497-03
Use the following procedure to remove and replace the blower module.
Step 1
Remove the blower module from the chassis (
Figure 6-5
):
a.
Lift the blower module handle to its carrying position.
b.
Loosen the four captive screws on the blower module faceplate.
c.
Remove the blower module by grasping it on each side and pulling it straight
back from the chassis.
Figure 6-5
Removing the Blower Module
1
Carrying handle
2
Captive screws (2 on each side)
129401
HIGH SPEED BLO
WER
2
1
Содержание 12006 series
Страница 4: ......
Страница 16: ...Contents 14 Cisco 12006 and Cisco 12406 Router Installation and Configuration Guide OL 11497 03 ...
Страница 28: ...xxiv Cisco 12006 and Cisco 12406 Router Installation and Configuration Guide OL 11497 03 ...
Страница 344: ...Index IN 14 Cisco 12006 and Cisco 12406 Router Installation and Configuration Guide OL 11497 03 ...