Table 6 ( Continuation ): Instantaneous value screens�
Screen
Parameters
L3 Current
Active three-phase power
Reactive three-phase power
(1)
Apparent three-phase power
L1 Power Factor
L2 Power Factor
L3 Power Factor
Hours of operation from manufacture
(1)
The unit must be connected to the L1 phase to calculate the reactive power.
18
CEM-C20
Instruction Manual
Содержание CEM-C20
Страница 1: ...INSTRUCTION MANUAL M016B01 03 17B Multifunctional energy meter CEM C20 CEM C20 MID...
Страница 2: ...2 CEM C20 Instruction Manual...
Страница 35: ...8 CE CERTIFICATE 35 Instruction Manual CEM C20...
Страница 36: ...36 CEM C20 Instruction Manual...
Страница 37: ...37 Instruction Manual CEM C20...