EGS3 Hardware Interface Description
Figures
8
EGS3_HD_v01.000a
Page 7 of 117
2009-08-12
Confidential / Released
Figures
Power supply limits during transmit burst....................................................... 25
Position of reference points BATT+and GND ................................................ 26
Powerup with operating voltage at BATT+ applied before activating IGT...... 28
Powerup with IGT held low before switching on operating voltage at BATT+ 29
Timing of IGT if used as ON/OFF switch ....................................................... 30
Signal states during turn-off procedure.......................................................... 35
Timing of CTSx signal (if CFUN= 7)............................................................... 48
Timing of RTSx signal (if CFUN = 9).............................................................. 48
C interface connected to VCC of application ............................................... 55
C interface connected to VEXT line of EGS3 .............................................. 55
Line input configuration with OpAmp ............................................................. 62
Slave PCM Timing, Short Frame selected ..................................................... 67
Slave PCM Timing, Long Frame selected...................................................... 67
4 layer PCB stack for EGS3 interface board.................................................. 72
RF line on interface board. All dimensions are given in mm .......................... 74
Numbering plan for connecting pads (bottom view)....................................... 79
Dimensions of EGS3 (all dimensions in mm)............................................... 100
Recommended stencil design (bottom view) ............................................... 102
Moisture barrier bag (MBB) with imprint....................................................... 108