![Cincinnati Sub-Zero ZP Series Скачать руководство пользователя страница 79](http://html.mh-extra.com/html/cincinnati-sub-zero/zp-series/zp-series_installation-operation-and-maintenance-manual_2607298079.webp)
MAINTENANCE WITH Q & A
67
16.
Humidity Sensor
It is recommended to perform this routine maintenance monthly to avoid inaccurate readings.
If you are having trouble achieving levels or if you can see dirt, please make sure to clean the
sensor.
Depending on the conditions of measurement, the dust filter should be checked from time to
time. Corroded, discolored, or clogged filters should be replaced.
17.
Product High Limit (Check every 3 months)
Check for proper operation by lowering the setpoint and tripping the safety.
18.
Water Strainer (Water Cooled Units)
Check/Clean the water strainer (if equipped).
YEARLY
19.
Water-Cooled Condenser (If Applicable)
Annually check the condenser for buildup of scale on the condensing surface. This interval may
need to be shortened if the buildup is of a substantial amount.
20.
Chamber Controller Calibration/Verification
Calibrate/Verify the chamber controller settings if all instruments in your facility are periodically
calibrated to one device (metrology), or if a measurement system component fails. The
calibration/verification procedure is located in the Controller Manual which accompanied your
unit.
21.
Diaphragm, Air Compressor (Atomizer)
If chamber is equipped with an atomizer, the diaphragm in the air compressor should be
checked for wear annually. If chamber runs high temperature (above 60°C) and high humidity
levels (over 60%) the diaphragm may need to be replaced more frequently.
22.
Lubricate Motors (If Applicable)
If any of the motors have an oil or grease fitting, the proper lubricant should be applied. Contact
the motor manufacturer or CSZ for the correct lubricant.
Содержание ZP Series
Страница 1: ...58911 rev B 1 2021 Installation Operation Maintenance Manual ZP Series ...
Страница 4: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 6: ...CHAMBER LABELS AND MEANINGS ii THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 12: ...TABLE OF CONTENTS viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 24: ...GENERAL DESCRIPTION 12 Figure 2 4 Achievable Humidity Points ...
Страница 52: ...GENERAL DESCRIPTION 40 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 66: ...OPERATING INSTRUCTIONS 54 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 96: ...MAINTENANCE WITH Q A 84 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 98: ...SERVICE PARTS WARRANTY 86 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 99: ...SYSTEM DIAGRAMS ELECTRICAL SCHEMATIC SYMBOLS Figure 9 1 Symbols Used on Electrical Scematics ...
Страница 100: ...SYSTEM DIAGRAMS ELECTRICAL SCHEMATIC SYMBOLS Figure 9 1 Symbols Used on Electrical Scematics Continued ...