
- 7
-
NOTE: When leaving reheatable material in tank, allow the agitator to run until the oil
and material temperatures are the same.
PROCEDURE:
PAGE
18)
Turn the temperature control box off and shut off engine.
14,16
19)
Coil sealing hose and place in cabinet along with wand (Non-heated
hose models only).
20)
Lock hose boom in tow position.
21)
Always secure sealing wand, sealing hose and hose boom
before towing the Melter.
Operating Sequence
On electric hose option only.
Содержание MAGMA 110
Страница 48: ... 48 Wiring Diagrams Refer to Individual Wiring Diagrams for Details ...
Страница 49: ... 49 Wiring Diagrams Trailer Wiring Diagram ...
Страница 50: ... 50 Engine and Burner Wiring Harness Wiring Diagrams ...
Страница 51: ... 51 Wiring Diagrams Relay Panel ...
Страница 52: ... 52 Wiring Diagrams Temperature Control Wiring Diagram ...
Страница 53: ... 53 Wiring Diagrams Primary Control ...
Страница 54: ... 54 Wiring Diagrams LOFA Engine Shutdown Heated Hose Generator ...
Страница 59: ... 59 Plumbing System Parts List Dual Wand Single Wand ...
Страница 75: ... 75 11 12 Miscellaneous Parts ...
Страница 77: ... 77 ...
Страница 78: ...2601 Niagara Lane Plymouth MN 55447 763 557 1982 800 328 3874 Fax 763 557 1971 ...