![CIC Torus 100 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/cic/torus-100/torus-100_installation-instructions-manual_2606828003.webp)
Power
Before You Begin
AC Power
110-240V
OR
Power over Ethernet
POE / POE+ / POE++
The cabinet can be powered from a
regaular power outlet or by using
POE. Make sure the chosen option
is ready and available before
commencing installation.
The relevant ports should be within
2m / 6’ of the cabinet.
Provisioning key
The provisioning key is a 12-digit number found in the Torus
software. Each cabinet has a unique provisioning key that
must be entered into cabinet to complete the installation.
Provisioning Key
Fasteners are not supplied with the Torus cabinet. Each fastener
must hold at least 50lbs / 20kgs and be appropriate for the wall
substrate.
Mounting holes:
Fasteners
10mm
15mm
Tools Required
Power
Spirit Level with Magnetic Base
Ratchet Driver with 10mm Socket
10mm Open Ended Ring Wrench
Plus drill and tools for chosen fasteners.
Note: If a card reader is being installed, additional tools will be
required. Refer to card reader mounting instructions.
Connectivity
LAN
Local Area Network
OR
4G SIM Card
Regular - not micro or nano
The Torus Administrator has been
sent an activation email detailing
the requirements for each of these
methods. Cabinets must be
connected to the internet to
function.
TORUS
Installation Guide
3