EN - 13 

NA 03.28 D

4. SYSTEM START-UP

Keep all inspection doors closed while the unit is operating.

A safety device protecting against insufficient air flow must inserted in the fan control.

Connect all electric components to earth.

4.1 Connecting the electric motor

The connection must be made by a qualified technician, as per the diagrams below and those included with the motor.

Before powering up the motor, test the insulation resistance. Failure to follow this recommendation will void the motor 
warranty. 

 

 Operating mode:

 Before carrying out any work, disconnect and uncouple the motor or the driven machine. 

 Measure the motor's insulation resistance before starting it up, particularly if the windings may be wet.

 

-

    ! #!$

 

-

The insulation resistance value is reduced by 50% if the room temperature increases by 20°C.

 Fit the motor casing and discharge the cables against the casing immediately after each measurement to prevent the risk of electric 

shocks.

 If you do not obtain the reference resistance value, the windings are too wet. They must then be dried in an oven at a temperature of 

90°C for 12 to 16 hours, then at 105°C for 6 to 8 hours.

 

-

During drying, remove the covers from the bleed holes and open the closure valves (if fitted to the motor). Remember to close 
them after drying. If the bleed caps are fixed, it is recommended to remove the terminal box flanges and covers for the drying 
operation.

 

-

Windings which have taken in sea water must normally be rewound.

The motors are equipped with a heat protection sensor which must be connected. Check the supply voltage, the input current and 
the calibration of the protective devices.

For motors with a power of 5.5 kW or above, we recommend Y/

'

 starting in order to limit the starting current (Id/In) and reduce the 

wear on the drive.

 

 Dual voltage type motor with Y coupling, 

'

 (6 terminals):    

230/400 V motor 
- 230 V supply voltage, connection (

'

): diagram A.  - 400 V supply voltage: (Y) connection: diagram B.

400/690 V motor 
- 400 V supply voltage, connection (

'

): diagram A.  - 690 V AC supply voltage (for P>5.5 kW), connection (Y): diagram B.

 

 Dahlander dual-speed motor or motor with reversible poles, 6 terminals.

These diagrams apply to three-phase, 3000/1500 rpm and 1500/750 rpm motors.

Low 
speed  
(LS)

High 
Speed  
(HS)

LS and HS for “2” contacts

A

B

Содержание CLIMACIAT airclean Series

Страница 1: ...10 2013 NA 03 28 D airtop airtech airclean Instruction manual...

Страница 2: ...13 4 2 Blade damper 14 4 3 Electric heater 14 4 4 Water humidifier 14 5 Maintenance 14 5 1 Casing 14 5 2 Dampers 14 5 3 Air filters 15 5 4 Humidifiers 15 5 5 Fan motor assembly 16 5 6 Sound attenuato...

Страница 3: ...but packaging in good condition are not admissible by insurance companies For all other problems please contact your CIAT representative for further information The unit must be stored in its packing...

Страница 4: ...ted using a forklift truck provided care is taken to avoid denting the bottom panel use sufficiently long forks Follow the applicable handling rules 3 INSTALLATION The equipment must be installed in a...

Страница 5: ...rmation of the lower block Assembling the two blocks Check the flatness and levelness of the mounting surface Fit the gasket on the sealing face between the blocks fig A Using the appropriate handling...

Страница 6: ...aligned sections Where possible door nearby footprint etc the clamps may be tightened on the inside with TH 6 x 60 bolts An optional decorative trim is available for bottom AIR CLEAN units only Dual f...

Страница 7: ...ion These sections are to be provided by the fitter and must be cut to suit the layout of the room and be sufficiently rigid The sections should not block access to the drawers and doors on the unit L...

Страница 8: ...ompletely watertight Counter frame sealing for outdoor installation Caulk during assembly Fitting the canopies Assemble the top panel 1 to its two side panels 2 and 3 with 6 mm screws washers and nuts...

Страница 9: ...ng G4 filter HPS filter HPR or carbon filter HEPA filter 3 4 Water and direct expansion coil Do not remove the protective caps until you are ready to connect the coils Coil with water supply Always us...

Страница 10: ...start of each winter If the outlet temperature on the frost protection coil is below 15 C use a constant volume control valve to prevent the frost protection alarm being triggered and frost forming on...

Страница 11: ...ure cable Max current 27 A Connect these wires to the designated terminals and the terminals on the manual and automatic reset thermostats depending on unit inside the box The stages power connection...

Страница 12: ...n should not operate unless the opening limit switch is tripped If a two speed motor is used the shift from high to low speed should be timed to avoid a braking effect 3 7 Fan motor assembly The sprin...

Страница 13: ...e belts as instructed in the previous section If changes are made to the drive make sure that it is compatible with the fan motor assembly motor current and the suspensions Direction of rotation of th...

Страница 14: ...They must then be dried in an oven at a temperature of 90 C for 12 to 16 hours then at 105 C for 6 to 8 hours During drying remove the covers from the bleed holes and open the closure valves if fitte...

Страница 15: ...ces by checking the operation of the fan one frequency at a time Fit Du Dt filters on the inverter side for the 690V networks 4 2 Blade damper Do not turn on the fan with the blades closed When the un...

Страница 16: ...ilter Its service life depends on how it is used type of impurities to be filtered concentration of these impurities average usage time air flow To find out the how long a filter will last under your...

Страница 17: ...ring need to be changed do not change the capping ring seat or filter Reassemble the cylinder by following the above steps in reverse order after checking or replacing if necessary the seal between th...

Страница 18: ...a year to avoid fibres coming loose and clogging the filters downstream 5 7 Heat recovery units Plate recovery units Once a year dust off and degrease the plate heat exchangers and service the control...

Страница 19: ...MK V air stream gas generator The electrical panel is delivered as standard on the front panel Generator delivered in a crate not fitted to the unit To be assembled on site by the fitter Outdoor MK D...

Страница 20: ...ed with a cleaning solution or disinfectant and soft cloth or special wipes Reminder Contaminants may be brought in each time a door is opened in a cleanroom or associated controlled environment COMPO...

Страница 21: ...o the coating by impacts air pollution animals or mildew moss and mould Damage caused by natural phenomena such as hail Damage caused by accidents 6 2 Duration of the air handling unit warranty SQ 2PR...

Страница 22: ...es etc must be grounded if necessary by grounding cables Always connect the motor heat protection see 4 SYSTEM START UP The installer must use all available devices to ensure that the temperature of t...

Страница 23: ...h include explosive atmospheres must provide all persons working on a site with information relating to using manual tools in complete safety There are two different types to be taken into considerati...

Страница 24: ...025 A 150 AIRTECH AIRCLEAN A025 A 600 AIR ACCESS Bezeichnung Klimazentralen CLIMACIAT AIR TOP A025 A 150 AIRTECH AIRCLEAN A025 A 600 AIR ACCESS est conforme aux dispositions des directives is in accor...

Страница 25: ...Industrielle d Applications Thermiques Corporation with a capital of 26 728 480 R C S Bourg en Bresse B 545 620 114 This document is not legally binding As part of our continuous drive to improve our...

Отзывы: