(8) Remove the generator drive belt. The generator
spill shield does not need to be removed.
(9) Remove three mounting pivot bracket bolts.
(10) Remove pivot bolt and bracket.
(11) Holding the generator in one hand, remove
adjustment nut and slide the generator off the T-bolt.
The T-bolt does not need to be removed.
(12) Lower the generator and remove through the
wheel well.
INSTALLATION
(1) For installation, reverse above procedures. The
generator field connector has a locking tab and will
snap when fully installed. Refer to group 7 Cooling
System, Belt Removal/Install Adjust. Tighten all fas-
teners to the proper torque. Refer to the Torque Spec-
ifications
chart
in
Group
8A,
Battery/Starter/
Charging Systems Diagnostics.
BATTERY TEMPERATURE SENSOR
REMOVAL
(1) Make sure ignition switch is in OFF position
and all accessories are OFF.
(2) Remove battery negative cable first then the
positive cable (Fig. 12).
(3) Remove battery thermoguard (Fig. 13).
WARNING:
TO PROTECT THE HANDS FROM BAT-
TERY ACID, A SUITABLE PAIR OF HEAVY DUTY
RUBBER GLOVES, NOT THE HOUSEHOLD TYPE,
SHOULD BE WORN WHEN REMOVING OR SERVIC-
ING A BATTERY. SAFETY GLASSES ALSO SHOULD
BE WORN.
(4) Remove temperature sensor mounting nut from
battery tray (Fig. 14).
Fig. 11 Generator Rear View
ADJUSTMENT BOLT
SPILL SHIELD
PIVOT
NUT
W/ANTI-
ROTATION TAB
B+ TERMINAL
FIELD CONNECTION
Fig. 12 Removal of Battery Cables
BATTERY
BATTERY
TERMINAL
PULLER
Fig. 13 Battery Thermoguard
THERMO-
GUARDCOVER
BATTERY
HOLD DOWN CLAMP
Fig. 14 Battery Temperature Sensor Location
BATTERY
BATTERY
TRAY
BATTERY TEMPERA-
TURE SENSOR
AIR
INLET
TUBE
PULL STRAP
CAUTION
DANGER
8C - 12
CHARGING SYSTEM
PL
REMOVAL AND INSTALLATION (Continued)
Содержание Neon PL 1997
Страница 4: ...Charging System Schematic Typical 8C 4 CHARGING SYSTEM PL DIAGNOSIS AND TESTING Continued ...
Страница 14: ......
Страница 15: ...CHARGING SYSTEM CONTENTS page DIAGNOSIS AND TESTING CHARGING SYSTEM 2 PL CHARGING SYSTEM 8C 1 ...
Страница 16: ...DIAGNOSIS AND TESTING CHARGING SYSTEM INSPECTION Charging System Test 8C 2 CHARGING SYSTEM PL ...