background image

8

Please check after opening the packing that all the parts shown in 
the following parts lists are there. Once you are sure that this is the 
case, you can start assembly.
Please contact us if any components are defective or missing, or if 
you need any spare parts or replacements in future:

 

Top-Sports Gilles GmbH

 

Friedrichstr. 55

 

42551 Velbert

 

Telefon: +49 (0) 20 51 - 6 06 70 

 

Telefax:  +49 (0) 20 51 - 6 06 74 4 

 

e-mail: [email protected]

 

www.christopeit-sport.com

 

 

  Illustration 

Designation 

 

Quantity 

Installed on  

ET number 

 

No. 

 

 

 

Illustrations No. 

 

Playing field 

 

2+3 

36-9210101-BT

 

Long side boards 

 

36-9210201-BT

 

Short side boards 

 

36-9210202-BT

 

Leg 

 

36-9610104-BT

 

Leg-panel 

 

36-9610105-BT

 

Ball collector 

 

36-9210-07-BT

 

Ball returns 

 

36-9210-08-BT

 

Ball in cup 

 

36-9210-09-BT

 

10 

Plastic cover for side boards 

 

36-9210-10-BT

 

11 

Counters 

 

36-9210-11-BT

 

12 

Ball return tube 

 

7+8 

36-9210-12-BT

 

13 

Griprod for 1+3 Figuren 

 

36-9210-13-BT

 

14 

Griprod for 2 Figuren 

 

36-9210-14-BT

 

15 

Griprod for 5 Figuren 

 

36-9210-15-BT

 

16 

Rubber handle 

 

13+14+15 

36-9210-16-BT

 

17 

Rod cap 

 

13+14+15 

36-9210-17-BT

 

18 

Bumper  

 

16 

13+14+15 

36-9210-18-BT

 

19 

Plastic washer 17/38  

 

16 

13+14+15 

36-9210-19-BT

 

20  

Player team I (red) 

 

11 

13+14+15 

36-9210-20-BT

 

21 

Player team II (blue) 

 

11 

13+14+15 

36-9210203-BT

 

22 

Bushing for Pos. 13 

 

13 

36-9210-22-BT

 

23 

Filister-head screw 3/32“ x 28 mm 

 

26 

20+21 

36-9210-23-BT

 

24 

Selflocking nut 3/32“ 

 

26 

23 

36-9210-24-BT

 

25 

Goal 

 

36-9210-25-BT

 

26 

Hexagonal screw 5/16“ x 75 mm 

 

12 

36-9210-26-BT

 

27 

Washer 8/19mm 

 

32 

26+29 

36-9210-27-BT

 

28 

Nut 5/16“ 

 

12 

26 

36-9210-28-BT

 

29 

Hexagonal screw 5/16“ x 38 mm 

 

2+3 

36-9210-29-BT

 

30 

Fillister-head Philips screw 4 x 12 mm // 4 x 16 mm 

 

22 

7+8+9+36 

36-9210-30-BT

 

31 

Fillister-head screw 4 x 30mm 

 

20 

36-9210-31-BT

 

32 

Fillister-head Philips screw 4 x 45 mm 

 

11 

36-9210-32-BT

 

33 

Fillister-head screw 3,2 x 20 mm 

 

25 

36-9210-33-BT

 

34 

Bearing unit 

 

16 

36-9610109-BT

 

35 

Ashtray 

 

36-9210-35-BT

 

36 

Drink holder 

 

36-9210-36-BT

 

37 

Ball 

 

 

36-9210-37-BT

 

38 

Spare part Set (each 1player) 

 

 

36-9210103-BT

 

39 

Tool Set 

 

 

36-9210-39-BT

 

42 

Assembly and operating instructions 

 

 

36-9210204-BT

 

43 

Filister head screw 5 x 60 

 

4+5 

36-9210-43-BT

 

44 

Barrel nut for No. 43 

 

36-9210-44-BT

Parts List – Spare Parts List
KICKER ROMA Order No. 92102

Technical data: 

   Issue: 01. 02. 2012 

 

Show Kicker with noticeable design.

 

Rugged wood frame and legs with leg panel

 

22 changeable, multi colour, screwed players

 

16mm full steel rods chrome plated slide in bearings

 

Ball returns on players’ side

 

2 counters in attractive design

 

2 goals chrome plated and 2 Balls

 

2 Ball in cups and 2 ball returns chrome plated

 

2 drink holder and 2 ash tray chrome plated

 

Dimension playing field approx.: L 120 x W 68 cm

 
 

Space requirement approx.: L 140 x W 116 x H 87 cm

Содержание 92102

Страница 1: ...1 Montage und Bedienungsanleitung f r Bestell Nr 92102 Assembly and exercise instructions for Order No 92102 GB D KICKER ROMA...

Страница 2: ...Trockenen ebenen Ort aufstellen und es vor Feuchtigkeit und N sse sch tzen Bodenunebenheiten sind durch geeignete Ma nahmen am Boden und sofern bei diesem Ger t vorhanden durch daf r vorgesehene just...

Страница 3: ...2 2 36 9210 08 BT 9 Balleinwurfeinheit 2 2 36 9210 09 BT 10 Kunststoffkante f r Seitenrahmen 2 2 36 9210 10 BT 11 Trefferz hl Einheit 2 3 36 9210 11 BT 12 Ballr cklaufrohr 2 7 8 36 9210 12 BT 13 Grif...

Страница 4: ...mit Kreuzschlitz Bit erleichtert und verk rzt die Montage erheblich Schritt 1 Montage des Grundrahmens Stellen Sie die L ngsseitenrahmen 2 und die Kopfseitenrahmen 3 wie im nebenstehenden Bild dargest...

Страница 5: ...ntieren sie diese mittels der Schrauben 32 hinter den Toren auf dem Kopfseitenrahmen Schritt 4 Montage der F e und Fu querstreben Stecken Sie die Fu querstreben 5 in die entsprechenden Aufnahmen an de...

Страница 6: ...ren da diese bei ggf sp ter einmal erforderlichen Reparaturen bzw Ersatzteilbestellun gen ben tigt werden Der Kicker sollte bei Standortwechsel nicht einseitig gezogen oder verschoben sondern von 2 ge...

Страница 7: ...in a dry level place and protect it from moisture and water Uneven parts of the floor must be compensated by suitable measures and by provided adjustable parts of the machine if such are installed 5...

Страница 8: ...5 36 9210203 BT 22 Bushing for Pos 13 4 13 36 9210 22 BT 23 Filister head screw 3 32 x 28 mm 26 20 21 36 9210 23 BT 24 Selflocking nut 3 32 26 23 36 9210 24 BT 25 Goal 2 3 36 9210 25 BT 26 Hexagonal s...

Страница 9: ...ng scratching the parts You can shorten up the assembling time by using an electric Screw driver with cross head bit if you have English Step 1 Assembly of main frame Put the long side boards 2 and sh...

Страница 10: ...rews 4 x 16 mm 30 Put the counters together in the right way and place them with screw 32 into appropriate position on Small side frame behind the goal Step 3 Assembly of goal door ball returns and ba...

Страница 11: ...l lays in an area where no one can get it you have to take the ball and place it in the nearest corner to go on with the game 10 OUT If the ball gets out of the playing ground during the game it must...

Страница 12: ...llungen oder Reparaturen wenden Sie sich bitte an unsere Service Abteilung Service Top Sports Gilles GmbH Tel 49 0 2051 6067 0 Friedrichstrasse 55 info christopeit sport com Fax 49 0 2051 6067 44 D 42...

Отзывы: