NEXGEN60 InstallationRev1
Page
18
of
42
04/11/2022
SECTION 3
OPERATION
3.1 START-UP PROCEDURES AND CHECKS
Check that all components are mounted securely. Check that all plumbing is secure and
tight. Check that all plumbing and electrical connections are connected in the proper
place.
Ensure that all system isolation valves installed during installation are open.
Fill the Saturated Salt Feeder with pure rock or pellet salt.
Do Not Use Granular Salt.
Open both Saturated Salt Feeder valves.
Fill the muriatic acid container with a 50% water to 50% muriatic acid solution.
Turn on any breakers or disconnect boxes used for circuit protection.
Ensure the blue cord is connected to a chemical feed controller and the controller is calling
for feed, or that the blue cord is plugged into a live outlet.
The NEX-GEN will go through a series of startup steps and automatically start generating
chlorine.
If the NEX-GEN does not start automatically, see Troubleshooting in section 6.
3.2 ADJUSTING CHLORINE OUTPUT
Adjust the flow through the flow meter for the following
production rates:
3.3 GPM = 72 pounds of chlorine production per day
2.6 GPM = 58 pounds of chlorine production per day
2.2 GPM = 63 pounds of chlorine production per day
1.0 GPM = 54 Pounds of chlorine production per day
NOTE
The maximum production rate of 72 pounds is
achieved at 7000 ppm salt concentration and 3.3
GPM.
Adjustments in excess of 3.3 gallons per minute will
not produce more chlorine. Adjustments in excess of
3.3 gallons per minute will consume excess salt.
Flow
Control
Flow Meter