10
www.chinowing.com
Fig 2 Ground terminal connection
2. Please confirm whether your data link is H840 or P900, and then select the corresponding
parameters setting software.
1) If you are using Version H840, use the corresponding parameters setting software, select the
corresponding port and click the connection to read the data link parameters, as shown in the
figure below(Note: H840 is currently, no production)