![China Honway Machinery HWG 400 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/china-honway-machinery/hwg-400/hwg-400_operators-instruction-manual_2601807008.webp)
ASSEMBLY
Fit the handle
Changing the diamonds
•
Remove the screws (A).
Shut down the machine and disconnect the power plug.
Have a set of gloves ready, as diamond tools can get very hot.
•
Crank up the handlebar to the highest position.
•
•
Remove the locking knobs (B).
Fit the handle in the handle stand-off on the machine.
•
•
Pull back on handle to lift grinding head off the ground.
Lay machine back on the ground.
•
•
Refit screws (A) and locking knobs (B).
The locking knobs should be positioned in-line with the
handlebar to reduce the risk of damaging the knobs when
laying down the machine when changing tools.
•
•
Put on gloves.
Use a hammer to remove the diamond segments.
•
Affix new diamond segments on the grinding disc.
•
Once new diamond segments have been attached,
reverse procedure to lower machine to ground.
7
http://www.honwaymachinery.com
Содержание HWG 400
Страница 17: ...WIRING DIAGRAM 16 http www honwaymachinery com...