China Honway Machinery HWG 400 Скачать руководство пользователя страница 1

China Honway Machinery Co.,LTD

Operator’s Instruction Manual

Floor Grinder

HWG 400

China Honway Technology Co.,LTD
5bldg Changhua Park. Yuelu District, Changsha, China
Tel

0086-0731-84223603

Fax

0086-0731-84227598

Cell Phone: 0086-13077380137
Email: [email protected]
Website:  www.honwaymachinery.com

Содержание HWG 400

Страница 1: ...on Manual Floor Grinder HWG 400 China Honway Technology Co LTD 5bldg Changhua Park Yuelu District Changsha China Tel 0086 0731 84223603 Fax 0086 0731 84227598 Cell Phone 0086 13077380137 Email sales h...

Страница 2: ...an approved breathing mask Always provide for good ventilation Protective goggles or a visor must be worn Starting Reduce the pressure between grinding disc and floor by pushing down on the handle wi...

Страница 3: ...it the handle Changing the diamonds Connect the vacuum cleaner Transport GRINDING GUIDE Diamonds Determining the hardness of concrete Diamond selection The motor s direction of rotation STARTING AND S...

Страница 4: ...ifting eye Electric motor Lifting handle Skirt Connection for vacuum cleaner Wheel set 11 Screws cover 12 Grinding plate 13 Grinding pads 14 Handle handlebar 15 Control Panel 16 Start button 17 Emerge...

Страница 5: ...questions about the use of the machine We will willingly be of service and provide you with advice as well as help you to use your machine both efficiently and safely Let your dealer regularly check...

Страница 6: ...where potential for fire or explosions exist Electrical safety unfavourable weather conditions and body Never drag the machine by means of the cord and never pull out the plug by pulling the cord Kee...

Страница 7: ...ding the machine must be connected to a vacuum cleaner to sucking off the dust When changing the grinding discs ensure power supply to the unit is OFF by engaging the Emergency Stop button and the pow...

Страница 8: ...Pull back on handle to lift grinding head off the ground Lay machine back on the ground Refit screws A and locking knobs B The locking knobs should be positioned in line with the handlebar to reduce...

Страница 9: ...he rubber skirt to be in contact with the floor to ensure efficient dust collection Transport The machine can be folded to minimize space needed for transport Loosen the screws and the lock handle tha...

Страница 10: ...and therefore require a soft bond segment Accordingly if a concrete surface is coarse aggressive e g rain damaged shot blasted scarified exposed aggregate e t c the concrete will behave as if it has a...

Страница 11: ...rformance of the machine the productivity levels and also the finished floor quality There are a number of different diamond configurations that can be achieved on WGS400E Metal bond diamonds Full set...

Страница 12: ...X Epoxy paint removal Medium concrete Medium 16 30 X Epoxy paint removal Soft concrete Hard 16 30 X Rain damaged concrete Hard 16 30 X X Smoothen exposed aggregate Hard 16 30 X X Lippage removal in t...

Страница 13: ...configuration for your application 12 Applications Full set outer row Half set outer row Polishing terrazzo stone tiles X Resurfacing terrazzo stone tiles X Surface polishing of concrete floors Hard...

Страница 14: ...clockwise Use the stop button to shut down the machine Keep grinding segments in contact with the floor when stopping This will help bring the machine to a complete stop quickly Do not lift the grind...

Страница 15: ...ly or have different heights Check to ensure all diamonds are fitted correctly and are the same height Rubber shock absorber pads Check the rubber shock absorbing pads every month Replace if necessary...

Страница 16: ...ation of 1 0 dB A PG 400 SF Motor Power kW hp 4 5 4 Rated current A 16 Rated voltage V 400 Weight kg lbs 155 254 Grinding width mm inch 400 16 Grinding pressure kg lbs 65 143 Speed rpm 1400 Noise emis...

Страница 17: ...WIRING DIAGRAM 16 http www honwaymachinery com...

Отзывы: