
4
Figure 3
STEP 3
STEP 4
Figure 4
Carefully install Panels (F) and Top Rails (E) (from
Step 2) into End Panels Left (A). Panel (F) will be
installed into receiving grooves in Top Rails (E) and
long perimeter rail on Top Shelf (C). Dowel Pins (J)
will be inserted into receiving holes in End Panel
Left (A).
Note: Figure 3 shows one (1) of Panels (F) and Top
Rails (E) installed on left side with opposite side
partially assembled into place.
See Figure 3.
Carefully attach End Panels Right (B) to opposite
end using six (6) Allen Head Bolts (H) and following
the same process outlined in the previous steps.
Carefully guide Dowel Pins (J) into their receiving
holes. Tighten all Allen Head Bolts (H) securely.
See Figure 4.
AB20090_A6
C
F
E
A
AB20090_A7
B