Installation Instructions
OLCB1U
5
TOOLS REQUIRED FOR INSTALLATION
PARTS
#2
1/2"
5/32" (included)
9/16”
D (4)
E (4)
[Interface Bracket Hardware Kit] - 2 (Qty per bag)
B (4)
C (4)
A (4)
F (4)
G (4)
J (1)
M6x25mm M8x20mm
M8x30mm
M6x16mm
.750x.323x.250
.750x.344x.500
5/16"
L (4)
[Interface bracket]
1/4-20 x 1 1/4"
H (1)
[Mount assembly]
P (1)
5/16-18 x 2"
W (4)
3/8"
N (1)
1/4-20 x 2"
Q (1)
1/4-20
R (1)
5/16-18
S (2)
5/16"
T (2)
1/4"
U (2)
3/8-16 x 4"
V (2)
3/8-16
M (1)
#10-24 x 1/2"
[Interface Lockout Bag] - (4) - (Qty per bag)
[Box-column Hardware Kit]
K (1)
5/32"
Содержание OLCB1U
Страница 10: ...OLCB1U Installation Instructions 10 ...
Страница 11: ...Installation Instructions OLCB1U 11 ...