Installation Instructions
MSP-TEQ9
11
Concrete or Concrete Block Wall
1.
Mark the wall through the adjustable leg (N) at the lower end
of each upright assembly. (See Figure 13)
2.
Adjust lower part of leg upward, or slide upright assembly
left or right (see
Adjustments
section) to allow room to drill
pilot hole.
Figure 13
3.
Drill one 1/4" x 2-3/4" pilot hole at marking. (See Figure 13)
4.
Install a toggler (U) into pilot hole using a hammer. (See
Figure 13)
5.
Return leg or upright assembly to position over pilot hole.
6.
Use one 1/4-20 x 2-1/2" lag bolt (W) and one 1/4" flat
washer (V) to attach adjustable leg (N) to anchor in wall.
(See Figure 13)
7.
Repeat Steps 2 through 6 for other upright assembly.
Adding Covers
1.
Open the lower flaps of the wall bracket cover (L) outward.
(See Figure 14)
2.
Slide the cover downward, hooking the top of the wall
bracket covers (L) onto the tabs on top of wall assembly
brackets. (See Figure 14)
3.
Slide the lower flaps of the wall bracket cover (L) under the
bottom of the wall assembly brackets (K). (See Figure 14)
Figure 14
4.
Slide the sliding cover (M) down over the wall bracket cover
(L) on both wall assembly brackets. (See Figure 15)
Figure 15
1
4
(U) x 2
3
6
(W) x 2
(N)
(V) x 2
1
1
2
Wall
bracket
tab
(L)
(K)
(M)
(L)
(M)
4