INSTALLATION PROCEDURES

The bracket attaches to the universal projector mount lifting and 
sliding the screws of the bracket into the slot and four vee slots of 
the universal projector mount (see Figure 5). Secure the bracket 
using provided thumb screws and route cabling as necessary. Install 
the universal projector mount on the bracket as follows:

NOTE:

  It is not necessary to remove the thumb nuts from the 

studs to install and remove the projector.

1.

Install, loosely, the 10-24 thumb nuts on the 10-24 studs of the 
universal projector mount.

2.

Align the four locating slots of the universal projector mount 
with the 10-24 studs of the bracket and slide the bracket on the 
universal projector mount to the limit of the slotted holes.

NOTE:

  The tapers of the thumb nuts should seat in the holes 

of the bracket.

3.

Secure the Bracket to the universal projector mount using the 
thumb nuts (tapered side down).

4.

Route cables as necessary.

CABLE MANAGEMENT 
PROCEDURES

1.

Route cables as necessary.

2.

Secure cables using cable ties (see Figure 7).

3.

Cut and install cable wrap.

Figure 7.  Cable Routing Example

Содержание MSP-DUK9000

Страница 1: ...e easy mounting methods adjust able column flush or threaded rod roll pitch and yaw adjust ment a cable management system and a universal bracket that allows quick projector disconnect without loss of...

Страница 2: ...g the Universal Ceiling Projector Mount CAUTION Inspect the unit for shipping damage See PARTS DIMENSIONS on page 2 TOOLS REQUIRED FOR INSTALLATION Wire Cutter Socket Set Wrenches Scissors Allen Wrenc...

Страница 3: ...mm Button Head Security Screw 4 70 M3 X 12mm Phillips Pan Head Screw 4 220 1 4 20 x 625 Button Head Security Screw 4 80 M3 Flat Washer Standard 4 230 1 4 20 NyLock Locknut 2 90 Universal Mini SLB Asse...

Страница 4: ...Instruction Manual MSP DUK9000 3 Acrobat Document...

Страница 5: ...for personal injury or of damage to the equipment if it is not adequately mounted The General Guidelines below and the information on the follow ing pages cover the most common mounting situations Su...

Страница 6: ...allation using an adjustable column or 1 diameter schedule 40 steel pipe section with 1 NPT threads requires securing the adjust able column or pipe to the building structure We suggest the use of a b...

Страница 7: ...Pro jector Mount can be secured to a typical unistrut angle or channel assembly at the overhead structural members trusses or I beams see Figure 4 Install the Universal Ceiling Projector Mount as fol...

Страница 8: ...Failure to use proper attaching hardware and installation procedures may result in equipment damage or serious per sonal injury 5 Determine proper screw size and depth M3 M4 M5 and M6 included for pro...

Страница 9: ...install and remove the projector 1 Install loosely the 10 24 thumb nuts on the 10 24 studs of the universal projector mount 2 Align the four locating slots of the universal projector mount with the 1...

Страница 10: ...from each corner 3 Using security wrench and security screws from All Points Security package secure Projector Interface Plate to projector 4 Using security wrench provided replace screws in Projecto...

Страница 11: ...two 1roll adjustment screws on the face and back of the Universal Ceiling Projector Mount Adjust roll as follows 1 Loosen the roll adjustment screw on the face and back opposite the pitch clamp see F...

Отзывы: