background image

Installation Instructions

MSP-DCCPPNR

11

SWING ARM ADJUSTMENTS

The dual swing arms are shipped installed in the center of  the 
top and bottom mounting brackets, which is the standard 
mounting configuration.

The top and bottom mounting brackets have slotted holes, 
allowing for lateral adjustment of the dual swing arms.

After the top and bottom mounting brackets have been 
installed between two wood studs 16” on center, the swing 
arms can be adjusted or moved off center, depending on the 
location of the mount, the size of the display, and the lateral 
movement needed to rotate the display.

The swing arms can be adjusted, as follows:

Adjusting the Swing Arms Off-Center

With no disassembly required, you can adjust the swing 
arms up to 1-inch to the left of center or up to 1-inch to the 
right of center.

Reconfiguring the Swing Arms Left of Center

With some disassembly and re-assembly required, you can 
move the swing arms to the left of center by reconfiguring 
the mount. Use the first and third slotted holes in the top 
and bottom mounting brackets.

Reconfiguring the Swing Arms Right of Center

With some disassembly and re-assembly, you can move 
the swing arms to the right of center by reconfiguring the 
mount. Use the third and fifth slotted holes in the top and 
bottom mounting brackets.

Adjusting the Swing Arms Off Center

Perform this procedure to adjust the dual swing arm mount 
configuration.

1.

Remove the display from the mount.

2.

Loosen four bolts (two on the top and two on the bottom) 
securing the swing arm assembly to the top and bottom 
mounting brackets (see Figure 12).

3.

Move the swing arm assembly to desired location.

4.

Tighten the bolts.

5.

Install the display on the mount.

Figure 12. Swing Arm Adjustment –

                   Slightly Off Center 

Top Bolts

Содержание MSP-DCCPPNR

Страница 1: ...verted into the built in path in the swing out arms After making the lateral rotational and tilt adjust ments the installation process is complete BEFORE YOU BEGIN Caution To prevent damage to the PNR which could affect or void the Factory warranty and to the equip ment that will be attached to it thoroughly study all instructions and illustrations before you begin the installation Pay particular ...

Страница 2: ...mount must not exceed 200 lbs 90 72kg the maximum load capacity of the mount WARNING Watch for pinch points Do not put your fingers between movable parts WARNING Make sure the mount and brackets are correctly oriented WARNING Make sure the flag securing the display is completely lowered at all times except when removing or installing the display CAUTION Check the unit for shipping damage before yo...

Страница 3: ...3 Installation Instructions MSP DCCPPNR DIMENSIONAL DRAWING ...

Страница 4: ...lude the PSB interface bracket INTERFACES Table 2 on page 4 provides the applicable mount interfaces TOOLS REQUIRED FOR INSTALLATION Allen wrench set Drill and bit set Wrench set NOTE Other tools may be required depending on the method of installation PARTS LIST Unpack the carton and verify the contents listed in Table 3 on page 4 If you are missing any of the listed parts contact Customer Service...

Страница 5: ...r supporting framework that is vertical or horizontal 2 Using a stud sensor locate the two wood studs where you will install the mount 3 Draw a level plumb line to indicate the desired height of the top mounting bracket 4 With an assistant lift and hold the mount against wall Use a pencil awl or small nail to mark the mounting holes where two pilot holes will be drilled into the cen ter of the woo...

Страница 6: ...t b Slide the mount into the desired position on the wall and tighten the two lag bolts 2 Mount the bottom bracket on the mount as follows a Mark the two mounting holes in the bottom mounting bracket see Figure 3 Make sure to align the holes parallel to the holes drilled in the top bracket b Drill two pilot holes in the wall studs c Install two lag bolts and two washers into the pilot holes d Tigh...

Страница 7: ...ght do the following Turn adjustment nut see Figure 4 clockwise CW to lower the unit height or Turn adjustment nut counterclockwise CCW to raise the unit height Install Cover Plates and End Caps NOTE The cover plates and end caps have pressure fitting ends that lock in place with each other 1 Install cover plate 20 over the top bracket See Figure 5 2 Install end cap 30 on the cover plate 20 See Fi...

Страница 8: ... mount Make sure buttons of PSB interface bracket fully engage all teardrop slots of the mount 4 Secure the mounting bracket to the mount by completely engaging the locking device see Figure 6 WARNING Make sure the locking device securing the dis play is completely engaged at all times except when removing or installing the display The locking device must be completely engaged during installation ...

Страница 9: ... video cables along bottom arm see Figure 8 using tiewraps 50 not shown to secure cables to each arm and through cable channel CAUTION To prevent equipment damage do not route cables through holes in the display mounting plate 3 Route power audio video cables to an open area behind the mounting plate not shown Leave a sufficient amount of slack in cables to allow for connection and extension where...

Страница 10: ...nt components 1 Using a 9 16 wrench slightly tighten or loosen lateral tilt tension adjustment nut see Figure 10 2 Mount the display and check for desired tilt tension 3 Repeat Steps 1 and 2 until desired tilt tension is obtained Rotational Tilt Tension Adjustment 1 If necessary loosen or tighten bottom rotational tilt tension adjustment nut see Figure 11 2 Mount the display and check for desired ...

Страница 11: ... inch to the right of center Reconfiguring the Swing Arms Left of Center With some disassembly and re assembly required you can move the swing arms to the left of center by reconfiguring the mount Use the first and third slotted holes in the top and bottom mounting brackets Reconfiguring the Swing Arms Right of Center With some disassembly and re assembly you can move the swing arms to the right o...

Страница 12: ...er see Figure 14 4 Install retaining pin assemblies one top and one bottom and secure using two bolts one top and one bottom 5 Install four bolts two on the top and two on the bottom to secure the swing arm assembly to the top and bottom mounting brackets see Figure 14 6 Tighten the bolts 7 Install the display on the mount REMOVE THE DISPLAY Perform this procedure when maintenance is required WARN...

Страница 13: ... repositioned in order to gain access to the tension adjustment screw s 3 Using the wrench provided with the mount turn adjust ment bar clockwise to increase swing arm tension or coun terclockwise to reduce swing arm tension see figure 16 and see figure 17 NOTE Small adjustments of 1 8 turn or less are typically all that is required to achieve desired tension 4 Check swing arm tension If desired t...

Страница 14: ......

Отзывы: