8
9
2
“CLICK!”
3
“CLICK!”
“CLICK!”
“CLICK!”
Setting Up the Playard
Setting Up the Playard
2. With the Lullaby Primo Frame
standing upright, pull the corners
apart as shown.
If needed, pull up on the center floor
hub release strap to lift the floor.
3. The center floor hub must be pulled
up to allow the top rails to lock.
With the center hub even (or level)
with the 4 corners. Pull up on the top
rail center joint to "Click" lock them
into their open position. Both sides of
the center joint must lock for the top
rail to stay open. Repeat for all four
top rails.
This step is very important for the
safety of your child. Make sure the
center hub is still pulled up during
this step or the side rails will not be
able to be latched.
Содержание Lullaby Primo
Страница 24: ...www chiccousa com ...