1. Insert the canister into the track and slide it into position.
Caution:
Refer to
Fastener Caution
in the Preface section.
2. Install the canister flange bolt.
Tighten
Tighten the evaporative emission (EVAP) canister flange bolt to 4 N·m (35 lb in).
3. Connect the canister fuel vapor hoses.
Page 2 of 2
Document ID: 2098086
7/5/2010
http://localhost:9001/si/showDoc.do?docSyskey=2098086&pubCellSyskey=124974&pubO...