![CHESTER Conquest Super Mill Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/chester/conquest-super-mill/conquest-super-mill_instruction-manual_2596688014.webp)
5.
Mechanism Adjustment
5.1 Installation and Removal of the Taper Shank
Installation
1.
Turn off the main power source before you replace the cutter.
2. Pull out the protective cover (a).
3. Wipe the spindle sleeve and taper shank.
4.
Put the taper shank (g) into the spindle sleeve. The cutter should be matted with an oil cloth.
5. Insert the fixing pin (d) on the spindle sleeve.
6. Use #14 open end wrench (c) to tight (clockwise) spindle draw bar (b) for fixing the taper
shank.
7. Pull out the fixing pin.
8. Install the protective cover (a).
Removal
1.
Turn off the main power before you replace the cutter.
2. Pull out the protective cover (a).
3. Insert the fixing pin (d) right on spindle sleeve.
4. Use the #14 open end wrench (c) to loosen.
5. Knock the taper shank (g) gently.
6. Cutter should be matted with an oil cloth.
7. Install the protective cover (a).
14
Содержание Conquest Super Mill
Страница 9: ...4 2 Assembly and Parts LONGITUDINAL Y AXIS CROSS X AXIS 9...
Страница 10: ...VERTICAL Z AXIS 10...
Страница 11: ...SPINDLE GEAR BOX 11...
Страница 22: ...8 2 Electrical Circuit Diagram 220V 240V 22...
Страница 23: ...105V 115V 23...