Controls
Initial Start
S
et the HIGH / LOW range lever to low. Connect to the power supply. Select FORWARD, using the
FORWARD / OFF / REVERSE Switch (A) on the main control Panel, then the power lamp (B) lights.
Switch on the Cobra Mill by slowly turning the Variable Speed Control Knob (C) clockwise.
The speed will increase progressively the further the knob is turned.
Run for a total of 5 minutes; gradually increase the spindle speed to its maximum. Run at top speed for at
least 2 minutes at top speed before stopping.
Check that all components are secure, working freely and correctly.
Check that the Cobra Mill is mounted securely.
Repeat the procedure at a HIGHspeed setting.
Caution
Never attempt to change from a HIGH to a LOW speed whilst the machine is running.
Starting Under Normal Conditions
1.
Take all the necessary precautions previously stated, and ensure the workpiece is fixed firmly.
2.
Select an appropriate speed level.
3.
Select the FORWARD / off / REVERSE to a FORWARD or REVERSE position.
4.
Proceed to start the machine as described above.
5.
Whilst not in use, switch off and disconnect from the power supply.
Notice
When using 100~120v power, the socket will have to have a auto overload protective function. If the
feed is to fast, or the drilling is too deep, the Cobra Mill will stop working and a yellow light (behind the
fuselage) will light up. By turning the Variable Speed control knob (D) and then turn on again, the Cobra
will now work again and the yellow lamp will off automatically.
Chester UK Cobra Mill
10
Содержание Cobra Mill
Страница 12: ...Part Diagrams Lists Chester UK Cobra Mill 11 ...
Страница 15: ...Circuit Diagram 220 240V 50 60Hz Chester UK Cobra Mill 14 ...
Страница 16: ...100 120V 50 60Hz Chester UK Cobra Mill 15 ...
Страница 19: ...2 2 Vertical Milling Machine ...
Страница 28: ......
Страница 29: ......