
Figures & Illustrations
Figure 1 - System Block Diagram
7
Figure 2 - SR -500 Jumpering
12
Figure 3 - SR -500 Installation
15
Figure 4 - System Menu
19
Figure 5 - Configure/Install System Menu
20
Figure 6 - SR -500 Test Point Pin Out
21
Figure 7 - System Menu
24
Figure 8 - File Select Menu
26
Figure 9 - File Selection List
27
Figure 10 - Test Failure Display
28
Figure 11 - Test Completed Menu
29
Figure 12 - Assembly Learn Menu
33
Figure 13 - Pin and Wire Name Entry Screen
34
Figure 14 - Operator Comments Entry Screen
36
Figure 15 - Sample Text File
39
Figure 16 - Pin Locating Display
41
Figure 17 - Cable Assembly Display
42
Figure 18 - Self-Test Result Display
43
Figure 19 - Self-Test Failure Display
44
Figure 20 - Configure/Install System Menu
45
Figure 21 - Report Configuration Menu
48
Figure A1 - SR-500 I/O Port Pin Out
Ap 2
Figure A2 - Cable Test Report With Failure
Ap 3
Figure A3 - Cable Test Report With No Failure
Ap 4
Figure A4 - Cable Wiring Report
Ap 5
Figure A5 - Batch Test Report
Ap 6
Table A1 - SR -500 Base Address Jumpers
Ap 8
Table A2 - Computer I/O Port Assignments
Ap 9
Table A3 - File Error Messages
Ap 11
CheckSum Model G-50 Manual - Page 2
Содержание G-50
Страница 6: ...CheckSum Model G 50 Manual Page 4 ...
Страница 9: ...Figure 1 System Block Diagram CheckSum Model G 50 Manual Page 7 ...
Страница 10: ...CheckSum Model G 50 Manual Page 8 ...
Страница 17: ...Figure 3 SR 500 Installation CheckSum Model G 50 Manual Page 15 ...
Страница 18: ...CheckSum Model G 50 Manual Page 16 ...
Страница 52: ...CheckSum Model G 50 Manual Page 50 ...
Страница 53: ...AppendixA Wiring Diagrams CheckSum Model G 50 Appendix Page 1 ...
Страница 62: ...CheckSum Model G 50 Appendix Page 10 ...
Страница 64: ...CheckSum Model G 50 Appendix Page 12 ...
Страница 68: ...CheckSum Model G 50 Appendix Page 16 ...
Страница 69: ...CheckSum Model G 50 Appendix Page 17 ...
Страница 70: ...CheckSum Model G 50 Appendix Page 18 ...