
3
EN
QUICK REFERENCE GUIDE
Strike Array 2 QRG Rev. 6
Multi-Product Mounting
The Strike Array 2 has an interlocking system to connect multiple Strike Array 2 or Strike Array 4 products together,
vertically or horizontally. Make sure the mounting clamps are capable of supporting the weight of the product. For our
Chauvet line of mounting clamps, go to
http://trusst.com/productcategory/truss-clamps/
Multi-Product Mounting Diagram
Remove the retaining pins
to release the integrated
hanging hardware
Insert the retaining
pins to lock the
fixtures together
Insert the integrated
hanging hardware into the
opening of the next fixture
(vertically or horizontally)
Latch button
Press and hold the latch
button to remove or
insert the retaining pins