background image

Chart Environmental Chambers 

 

System Installation 

System Installation 

 
 

❏ 

Location 

 
The location of the chamber should be chosen with a few items in mind: 

• 

The left side of the chamber has an access port, which allows passing power and 
data acquisition wires into the chamber and connecting to the device under test. 

• 

The top side of the chamber has the control box.  For safety and service reasons, 
this side must be kept clear at least three feet from the control box door. 

• 

The front of the chamber contains the door.  Enough room should be left so the 
door can swing fully open for ease of loading test items in and out of the chamber. 

• 

The rear of the chamber contains the blower motor assembly.  Space should be 
left to allow a service technician to access this assembly.  Also note that the 
blower assembly has an extended shaft that protrudes through the chamber wall 
and connects to the blower wheel.  Should the blower assembly ever need to be 
removed from the chamber, the blower will need to be able to slide back far 
enough to get the shaft back out of the chamber wall. 

• 

The chamber weighs approximately 200 pounds, if it is going to be placed on a 
surface, be sure the surface can support the weight safely. 

 

❏ 

Electrical Power Hook-Up 

 
The electrical power needs to be connected from above and into the back of the control 
box.  A large hole is provided in the back of the control console for the entrance of the 
power wires.  The power specs are given in the Specs section of this manual.  It is 
extremely important to run a properly sized ground wire.  It is often beneficial to provide 
a ground wire that is actually larger than conventional standards.  Doing so may aid in 
reducing any electrical noise problems.  When running power there should be at least one 
to two feet of flexible conduit before the chamber connection to leave room for 
expansion and contraction of the floor as well as allow for slight variances in chamber 
placement. If the chamber uses the cord/plug supplied by Chart, that will make 
connecting power much simpler.  If the customer does not wish to use the cord/plug 
assembly, it is possible to run wires directly into the control box and terminate at the 
same points as the cord/plug assembly did. 
 
All power needed to operate the chamber is generated/supplied from the main control 
box.  Only one main power supply is needed to operate the chamber.  The power of the 
control box does not have any provisions for powering any devices under test. 
 
After the installation is complete, it is important to check the rotational direction of the 
blower.  If the fans are not rotating in the proper direction, the heaters will not get 
sufficient air flow and cause premature burn-out and failure of the heater elements.  If the 
fans are not rotating in the proper direction, switch two of the power leads to the blower, 
as this should change the rotational direction.  Proper rotational direction will provide air 

 

 

7

Содержание 11744195

Страница 1: ...Chart Test Chambers CHART INDUSTRIES INC ISIS CHAMBER USER S MANUAL Rev A...

Страница 2: ...N 55306 USA Design Modification DO NOT use this product in any manner not consistent with the instructions outlined in this manual NEVER alter the design or perform service that is not consistent with...

Страница 3: ...ilure prone components and assemblies in the shortest possible time The unique characteristics of Chart Inc Environmental Chamber systems are of key importance in achieving this effectiveness The staf...

Страница 4: ...this symbol needs extra attention NOTE Text in this format is extra information helpful to the situation CAUTION Text in this format is information to help avoid personal injury and or property damage...

Страница 5: ...RUMENTS 5 TEMPERATURE SAFETY CONTROLLER 6 SYSTEM INSTALLATION 7 LOCATION 7 ELECTRICAL POWER HOOK UP 7 LIQUID NITROGEN PLUMBING 8 EXHAUST GAS PLUMBING 8 OPERATION 10 OPERATOR CONTROL SWITCHES 10 WATLOW...

Страница 6: ...ntents List of Tables TABLE 1 CHAMBER PERFORMANCE SPECIFICATIONS 4 TABLE 2 SYSTEM DETAILS 4 TABLE 3 DIMENSIONS AND UTILITIES 4 TABLE 4 LIQUID NITROGEN COOLING VALVE PARTS 16 TABLE 5 REPLACEMENT THERMO...

Страница 7: ...peration Servicing of this equipment and its associated utility service must be done only by properly trained personnel Liquid nitrogen and high voltages can all cause severe injury or death if not pr...

Страница 8: ...fety system A separate thermocouple is provided for the limit control and located inside the air plenum If this device has reached an alarm condition the system must be reset by pressing the Chamber R...

Страница 9: ...ortional solid state control of resistive heating elements in air conditioning plenum Programmable Control and Data Logging Controller Watlow Series 96 temperature controller Communications A serial c...

Страница 10: ...ing environment around the chamber to ensure safe operating conditions The liquid nitrogen control is done by a solenoid valve The solenoid valve is chosen for its compact size and high reliability Th...

Страница 11: ...Controller A temperature Hi Lo limit control protects the chamber against thermal runaway due to a primary controller fault or control device failure The input to the Hi Lo limit control is a type T...

Страница 12: ...k of the control console for the entrance of the power wires The power specs are given in the Specs section of this manual It is extremely important to run a properly sized ground wire It is often ben...

Страница 13: ...he nitrogen pipe system This relief valve should be rated at a pressure less than 175 psig or the lowest pressure rated component in the system This relief valve is not included with the system and sh...

Страница 14: ...the room containing the chamber as well as the ventilation system number of air changes must be done to determine this If it is determined that the room is ventilated well enough to not plumb the exh...

Страница 15: ...e requirements are listed in the Specifications section 2 With all function switches in OFF position connect power to the chamber 3 Be sure chamber enclosure door is closed securely 4 Turn the Control...

Страница 16: ...chamber from thermal run away and extreme temperature conditions 5 SERIAL COMM communications connection This connector is provided on the back of the control box for future serial communications wit...

Страница 17: ...ure Set Points The temperature set point for the chamber is displayed on the bottom display of the Watlow controller The set point is simply entered by using the up and down arrow buttons on the front...

Страница 18: ...l is a shielded type T thermocouple The thermocouple is mounted in the air flow plenum and is not directly visible The temperature safety controller has two independent set points One set point is a h...

Страница 19: ...t the LN2 supply is on and that there is sufficient LN2 to perform your test The pressure of the LN2 should also be verified and maintained at less than 175 psig Maintenance Tasks to be Performed on a...

Страница 20: ...m and tighten if necessary Maintenance Tasks to be Performed Every Three Months 1 Measure and record the resistance of the heater Changes in these measurements over time can help predict any future he...

Страница 21: ...rugged and shielded sensor designed to withstand the entire temperature range of the chamber The shielding helps ensure reliable input signals to the temperature controller Chart sells this wire by t...

Страница 22: ...lation thereof will be the responsibility of the customer Accessories and components not manufactured by Chart Industries Inc shall be warranted to the extent of the original manufacturer s warranty C...

Отзывы: