![Charnwood Country 12WB MkII Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/charnwood/country-12wb-mkii/country-12wb-mkii_operating-and-installation-instructions-manual_2591959009.webp)
Page 9
Country 6 8 12 9.02
water and check for leaks.
There are several ways of connecting
the stove to the flue. These are
illustrated in Figs. 5 to 8.
If the optional vertical rear flue
connector is used then the chimney
may be swept through the appliance,
except in the case of a Country 6 fitted
with a boiler.
Horizontal lengths of flue must be kept
to a minimum and should not be more
than 150mm (6 inches) long. The
sealing face of the flue collar must be
coated with fire cement before fixing
to the body of the stove using the two
screws provided. The blanking plate
must be removed, sealed with fire
cement and refitted, care being taken
to ensure that the fold on the blanking
plate is in line with the lugs on the
firebox as shown in Fig. 9. Ensure that
the clamping plate does not prevent the
throat plate from seating correctly. All
flue connections must be well sealed.
It is possible to pass a 16 inch diameter
sweeps brush through the appliance
but in most back outlet installations it
will be necessary to have a soot door
to enable the chimney to be swept. The
C O N N E C T I O N S T O
F L U E S
S O O T D O O R S
If an indirect cylinder is used then the
primary circuit should be filled with a
suitable inhibitor to prevent the build
up of scale and corrosion.
The boiler fits inside the stove replacing
the rear firebrick. On the Country 6 it
also replaces the throat plate.
Before fitting the boiler, remove the
front fence, the throat plate and the
rear firebrick. Knock out the knock-
outs for the boiler tappings in the back
of the firebox.
On the Country 6 boiler fit one back
nut on the flow tapping to come flush
with the back face of the boiler before
fitting the boiler into the stove.
Place the fibre washers over the
tappings on the outside of the appliance
and fit the two backnuts, ensuring that
the boiler is held tightly against the rear
inside face of the appliance and that the
top edge of the boiler is level or runs
uphill to the flow tapping.
Gaps between the boiler and the
firebricks should be filled with fire
cement.
Connect the boiler to the heating
system ensuring that the flow pipe rises
from the boiler. Fill the system with
F I T T I N G T H E
O P T I O N A L A D D - I N
B O I L E R
Drain Cock at Lowest Point
Drain Cock
Indirect Hot Water Cylinder
Cold Water Tank
Overflow
Feed and Expansion Tank
22mm Open Vents
Overflow
Domestic Hot Water Draw Off
G
r
a
v
it
y
R
e
tu
rn
2
8
m
m
G
r
a
v
it
y
F
lo
w
2
8
m
m
Fig. 4. Typical Gravity Hot Water System
With Bricked Up Fireplace
Fig. 5. Vertical Register Plate
Of Chimney
Soot Door
In Side or Rear
Register Plate
Fig. 7. Horizontal Register
Plate With Top Flue
Connection
Alternative Soot
Door Positions
Register Plate
With Soot Door
Fig. 6. Horizontal Register
Plate With Rear Flue
Connection
Soot Door
Alternative
Positions
Register Plate
With Soot Door
Fig. 8. Horizontal Register
Plate With Optional Vertical
Rear Flue Connector
Register Plate
With Soot Door
Alternative Soot
Door Positions
98
186
Содержание Country 12WB MkII
Страница 1: ...C H A R N W O O D C O U N T RY 6 MkII 8WB MkII 12WB MkII Operating Installation Instructions ...
Страница 2: ......
Страница 15: ......