
7
4. Intended use
Manually deployed emergency parachute for single seat and tandem hang gliders.
5. Operating limits
• Maximum operating speed:
115 km/h (32 m/s)
• Packing interval:
12 months; subsequently, re-packing is required and must be
documented in the packing and inspection record.
• Inspection interval:
We recommend a full inspection of the rescue system every 24
months; re-inspections must be documented in the packing and inspection record
• Permissible operating time:
10 years; subsequently up to 12 years when re-
inspected yearly
6. Required documents
• Operation instruction
• Packing and inspection record
• The enclosed engineering specifications for this air sports equipment is part of
these operating instructions
7. Mode of operation
In the case of an emergency situation during flight, deploy the reserve parachute by
pulling the release handle with a firm and quick motion. This causes the outer
container to open and the parachute (still packed inside the inner container) is
deployed into the airstream. The release handle is thereby thrown away together with
the reserve system!
The inner container is constructed in such a way that it releases the suspension lines
and the canopy with a little time lag. This way, unintended early opening is prevented