
www.charltonandjenrick.co.uk
23
LT5558 (ISS 7)
Method 2 (CABLE FIXING SYSTEM)
Using a No 14 masonry bit drill two holes in the rear wall within the range shown, fit rawl plugs provided and
screw eyebolts securely into plugs.
Remove paper back from length of seal around the rear flange of the fire.
NOTE: -The seal must be positioned to ensure an airtight seal when the appliance is fitted.
Position the fire close to fireplace, allowing sufficient access to thread the cable through the eyebolts. Feed the
cables (one cable to each side) through the top holes in the firebox, through the eyebolts, and back through the
bottom holes in the firebox as shown.
Push firebox fully back in the fireplace opening, allowing it to seal against it to seal against the surround.
Feed the cables through the adjusters and cable clamps and
slide the clamps up the adjusters. Pull the cable as tight as
possible and tighten the cable clamps. With a spanner
tighten up the adjuster nut to tension the cable and make
good the seal.
Note: -After fitting neatly coil up the excess cable. Do not cut
off the excess cable.
SECTION TEN Checking Operation of Fire (installation instructions)
CHECKING GAS SOUNDNESS
Turn on the gas supply to the appliance and check for soundness in accordance with current codes of practice.
Turn off the gas supply at the external Isolation valve.
Remove the pressure test point screw from the inlet elbow and connect the pressure gauge.
Turn on the gas to the appliance at the Isolation valve.
Rotating the control to the ignition position and push in to allow the air in the pipe to be purged.
Rotating the control knob a few times, check that the electrode is sparking at the gap between the
thermocouple tip and the electrode; continue until pilot ignition is established.
Depress the control knob slightly and rotate anticlockwise until the raised pointer is aligned with the large flame
symbol on the control panel.
Check the inlet pressure is Natural gas 20mbar. +/- 1.0 .
Turn off gas supply, at the isolation valve. Disconnect the pressure gauge and replace the pressure test point
screw.
Turn on the supply to the appliance and check the pressure test point for soundness with detection fluid.
Tensioning
Screw
Cable
Clamp