
RT125 Operator’s Manual
Service - 193
As Needed
To install chain:
1.
Lay chain on ground with teeth down and pointed toward unit.
2.
Fasten and adjust seat belt.
3.
Start tractor. See page 78 for start-up procedures.
4.
Release parking brake.
5.
Move ground drive control to reverse.
6.
Back unit up until chain extends past head shaft about 1’ (305 mm).
7.
Move ground drive control to neutral.
8.
Lower backfill blade, if equipped, to ground.
9.
Lower boom to horizontal position.
10. Set parking brake and verify parking brake indicator is on.
11. Turn ignition switch to STOP.
12. Pull rear end of chain over and about 10" (260 mm) past tail roller.
13. Use hoist to pull front end of chain over head shaft sprocket.
14. Move chain down boom until chain connector pin and lock key can be installed. Install connector pin
and lock key.
15. Tighten chain by pumping EPG into grease cylinder.
Time Augers
Ensure that augers are balanced, as shown. If
auger timing is off, unit will bounce from side to
side even in normal digging conditions.
To adjust timing:
1.
Remove bolts holding augers to auger shaft
and rotate either auger as needed until
augers are balanced.
2.
Reinstall bolts and tighten securely.
Содержание Ditch Witch RT125
Страница 1: ...RT125 Operator s Manual 1 Issue 2 1 Original Instruction 053 2942...
Страница 7: ...Overview 6 RT125 Operator s Manual About This Manual...
Страница 29: ...Safety 28 RT125 Operator s Manual Attachment Safety Alerts...
Страница 73: ...Operation Overview 72 RT125 Operator s Manual Leaving Jobsite...
Страница 81: ...Prepare 80 RT125 Operator s Manual Check Supplies and Prepare Equipment...
Страница 87: ...Drive 86 RT125 Operator s Manual Shut Down...
Страница 99: ...Transport 98 RT125 Operator s Manual Retrieve...
Страница 107: ...Backhoe 106 RT125 Operator s Manual Finish Job...
Страница 108: ...RT125 Operator s Manual Trench 107 Trench Chapter Contents Set Up 108 Operate 110 Finish Job 112...
Страница 118: ...RT125 Operator s Manual Saw 117 Saw Chapter Contents Set Up 118 Operate 119 Finish Job 121...
Страница 123: ...Saw 122 RT125 Operator s Manual Finish Job...
Страница 131: ...Plow 130 RT125 Operator s Manual Finish Job...
Страница 197: ...Service 196 RT125 Operator s Manual As Needed...
Страница 217: ...Specifications 216 RT125 Operator s Manual Declaration of Conformity Information...
Страница 220: ......
Страница 221: ......
Страница 222: ...RT125 Operator s Manual Service Record 221 Service Record Service Performed Date Hours...
Страница 223: ...Service Record 222 RT125 Operator s Manual Service Performed Date Hours...
Страница 224: ...RT125 Operator s Manual Appendix 223 Appendix Chapter Contents Engine Diagnostic Codes...