
14 chargepoint.com
10.
Use the driver bit to drive a lag screw into
the top-most mounting hole, leaving a 3 mm
(1/8 in) gap to hang the charging station on.
Keep the remaining two screws for later use.
11.
Hang the charging station on the protruding
screw using the notch on the back of the charging
station.
12.
Drive the remaining two lag screws
into the bottom mounting holes to
secure the charging station.
13.
Insert the exposed wires from the
hardwire circuit installation into the
corresponding holes, pushing the
cables up until the silver conductors
are no longer visible.
Note:
If mounting on an exterior wall
and bringing power through the rear knockout, apply sealant around the
rear knockout to prevent water ingress.
14.
Bring power through the bottom or
rear knockout.
15.
Ensure the service wiring can easily
reach the connectors on the charging
station’s input terminal block.
16.
Strip each wire 12 mm (1/2 in).
17.
Ensure the white levers on the terminal
block are open. Fully insert the wires
into the connectors on the left side of
the terminal block with the ground wire in the center.
18.
Press the three levers down until they snap into place.
Note:
The white levers are a pinch point. Be careful of fingers while handling
them.
(1) 2” screw
Side view
Содержание Home FlexCharfePoint
Страница 4: ...4 chargepoint com ...
Страница 6: ...6 chargepoint com ...