A
Qty: 2
Qty: 2
Qty: 4
#10-24x1-1/2”
Machine Screws
#10
Flat Washers
#10-24
Keps Nut
11
2
Items to Assemble
1 Top Lid
2 Half Handle
1 Handle Bracket
2 Machine Screws (#10-24 x 3/8”)
2 Machine Screws (#10-24 x 1-1/2”)
4 Keps Nuts (#10-24)
4 Flat Washer (#10)
Items to Assemble
1 Heat Indicator
1 Top Insulation Bowl
1 Flat Washer (5/16”)
1 Wing Nut
A
Assemble half handle pieces to handle bracket using (2) #10-24x1-1/2” machine screws,
(4) #10 flat washers, and (2) #10-24 keps nuts.
B
Attach handle assembly to lid using (2) #10-24x3/8” machine screws and (2) #10-24 keps
nuts.
Important:
Tighten both nuts securely at this time. You will be unable to
tighten these items
once the insulation bowl is attached.
A
Place temperature gauge. Hold it in place as you turn lid upside down.
B Note:
Be sure hole in top insulation bowl is aligned with temperature gauge. Attach wing nut “DO
NOT TIGHTEN” until after Step 3.
Qty : 1
B
B
A
Qty: 1
Wing Nut
5/16 Flat Washer
Top Insulation Bowl
Heat Indicator
#10-24
Keps Nuts
#10-24x3/8”
Machine Screws
Top Lid
Top Handle
May be factory assembled.
May be factory assembled.
Qty: 4
Half Handle
Half Handle
Handle Bracket
6 • 06601357