Tilt the unight to the upright position using the 4 eyelets at the top of the unit with a
forklift and sling/chain. The operator should be a certified forlift operator.
Lift the unit from the shipping pallet and position on the pad.
Secure the unit to the pad, see Step 2.
Gang the unit the the ajoining cabinets, see step 4.
Install the Slope Top, see Step 3.
Installation of the SVP3
Installation
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY
5
PART NO. 1000629
10
6
This completes Installation.
Lifting Eyelets