Part 1: GENERAL SPECIFICATIONS
2
1.3 Standard Equipment
♦
Modular construction for easy installation
♦
Deep tank design to withstand 15
°
list without water slosh
♦
Heavy duty dual chain drive with rear lugs
♦
Lift-out doors
♦
Open construction without panels for easy service and cleaning
♦
Exhaust vent extended to table level on each end
♦
All 304 stainless steel construction
♦
Flanged feet for deck mounting
♦
Interchangeable upper and lower spray arms
♦
2 HP drip proof pump/motor assemblies
♦
1/4 HP conveyor drive motor
♦
Make up water with constant flow during operation
♦
Dishwasher shutdown below 180
°
F final rinse temperature via thermal switch
♦
Manual fill for wash/rinse tank with water level sight gauges
♦
Manual Ball valve drain in each tank plumbed to a common connection
♦
Steam piping without threaded joints in tanks
♦
Remote mounted NEMA 4X control cabinet
♦
Common utility connections
♦
440/60/3 power supply
♦
120VAC control circuit
♦
Steam coil or electric tank heat
♦
Detergent/Chemical connection provisions
♦
Float switch low water heat protection with 5 second delay
♦
Door safety switches
♦
Conveyor jam limit switch
♦
Easily removable scrap screens
♦
Rinse saver device for water conservation
♦
Dishracks (peg rack and flat bottom rack)
Options and Accessories
♦
External steam booster heater 40
°
or 70
°
rise (specified at time of order)
♦
External electric booster heater 40
°
or 70
°
rise (specified at time of order)
(stainless steel, completely interplumbed and interwired)
♦
Right to left or left to right conveyor operation (specified at time of order)
♦
Choice of conveyor speed (250, 185, 135, 85, or 60 racks per hour)
(specified at time of order)
♦
Power unloader
♦
90
°
motorized rack advance conveyor (specify load or unload)
♦
Dishracks - dish or open (specify type)
♦
Table limit switch, unmounted (recommended on all conveyor installations)
Содержание 135-USN-72
Страница 1: ......
Страница 3: ...TECHNICAL PUBLICATION SHEET i TECHNICAL PUBLICATION SHEET ...
Страница 4: ...TECHNICAL MANUAL VALIDATION CERTIFICATE ii TECHNICAL MANUAL VALIDATION CERTIFICATE ...
Страница 5: ...APPROVAL AND PROCUREMENT RECORD iii APPROVAL AND PROCUREMENT RECORD ...
Страница 9: ...vii THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 36: ...THIS PAGE INTENTIONALLY LEFT BLANK 18 ...
Страница 74: ...56 Part 6 REPLACEMENT PARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 83: ...65 Part 6 REPLACEMENT PARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 96: ...74 Part 6 REPLACEMENT PARTS Figure 6 8 Rinse saver assembly 1 2 3 4 9 10 11 2 2 12 5 4 6 7 8 ...
Страница 98: ...76 Part 6 REPLACEMENT PARTS Figure 6 9 Steam coil assembly Tank 4 8 9 10 7 6 5 4 1 2 3 ...
Страница 126: ...94 Part 6 REPLACEMENT PARTS Figure 6 18 Dishracks and PRV 1 2 3 ...
Страница 130: ...98 Part 6 REPLACEMENT PARTS 1 2 3 4 5 6 7 8 9 Figure 6 20 MRAN 90 Pawl Bar ...
Страница 142: ...110 Part 6 REPLACEMENT P ARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 143: ...111 Part 6 REPLACEMENT P ARTS PART 7 ELECTRICAL SCHEMATICS Part 7 ELECTRICAL SCHEMA TICS ...
Страница 159: ...112 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 160: ...112 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 163: ...115 Part 6 REPLACEMENT P ARTS ...