INSTALLATION CHECK OFF LIST

This Slide Gate operator is installed for use in a Class _____ installation.

Each item on this installation check off list should be verified by the installer.

______ Two warning signs securely installed on each side of gate panel (required).

______ 1 or 2 safety photo beams installed, one across each side of gate opening (required).

______ 1 or 2 stop photo beams installed on each side of fixed gate panel (required).

______ Customer advised that gate in for vehicular traffic only (required).

______ A separate pedestrian entry and/or exit is provided (required).

______ Contact edges installed and functional at all hazard or pinch points.

______ Safety guards installed covering all cantilever wheels (required).

______ All controls located far out of reach of gate, fixed panel and operator (required).

______ This class operator is approved for the application of the operator (1, 2, 3 or 4) (required).

______ A sphere with a 2-1/4" diameter cannot be pushed through the gate or fixed panel.

______ A safety screen/mesh is installed with a minimum height of 4' from ground.

______ Controls intended to reset gate after obstructed installed in line of sight (required).

______ Hard wired contact sensors located and wired to avoid any mechanical damage.

______ Customer instructed and is clear on proper use of gate operator (required).

______ Customer instructed on proper use of all control devices used with operator.

______ Safety instructions were reviewed and left with customer (required).

______ Installer offered a preventative service/maintenance contract.

______ A photo of completed installation taken from front and back of gate and dated.

______ Gate conforms to the recommended ASTM F 2200-02 requirements.

Customer’s Signature

Date

Installer’s Signature

Date

Customer and installer should retain a copy of this check off list for their records.

Содержание LIFTMASTER PROFESSIONAL MSLDCBB

Страница 1: ...unit must only be installed by an experienced technician Disconnect AC power and batteries before servicing IMPORTANT Read and understand Warranty Page first Batteries not included MUST be connected f...

Страница 2: ...t Locations 16 MEGA SLIDE UL PARTS LIST Part Numbers and Descriptions 17 Parts Shipped 17 OPERATOR NOTES 18 WARRANTY 19 REPAIR PARTS AND SERVICE 20 TA B L E O F C O N T E N T S IMPORTANT SAFETY INSTRU...

Страница 3: ...is class operator is approved for the application of the operator 1 2 3 or 4 required ______ A sphere with a 2 1 4 diameter cannot be pushed through the gate or fixed panel ______ A safety screen mesh...

Страница 4: ...erator must be in the line of sight and must be an intended reset Access control devices of any kind that required intended on purpose activation may be used for this reset Devices that will cause an...

Страница 5: ...e secondary stop photo beam should be installed along the gate s path that is covered when open Photo beams are to be installed according to their manufacturer s instructions and are to be placed in a...

Страница 6: ...ds installed covering all cantilever wheels required All controls located far out of reach of gate fixed panel and operator required This class operator is approved for the application of the operator...

Страница 7: ...y to persons use photo electric eyes on both sides of gate and pressure sensing edges at all pinch points and at the front leading edge of the gate Safety loops vehicle detectors should be installed i...

Страница 8: ...helf maybe installed after all conduits are cut to proper height and all wiring has been properly routed NOTE Do not attempt to hook up the 120VAC mains if wires are LIVE or HOT Be sure power is off C...

Страница 9: ...is input to reset the unit after a 2nd sequential obstruction is sensed and gate is locked with siren running This input normally functions as listed below Acts same as 1 2 3 above with S2 6 off With...

Страница 10: ...R any input at J5 with control detectors receivers keypads timers etc wires to it must also be run to the same terminals of the second Along with these control wires both operators MUST share a common...

Страница 11: ...delay if activated MODE SELECTIONS SWITCH PACK S2 6 8 SWITCH 6 Sets auxiliary open input terminal 4 at J5 to be pulse open pulse close example residential applications SWITCH 7 AUTO CLOSE TIMER Defaul...

Страница 12: ...vel as possible but still ensuring that it will slow down just before reaching the closed position INSTANT REVERSE DEVICE IRD The instant reverse device is an internal circuit that continuously monito...

Страница 13: ...can be used with up to 15 rolling code remotes or passwords in HIGH security mode Alternately it can be used with up to 31 of any type remote in NORMAL security mode including any combination of roll...

Страница 14: ...the right side of the gate operator frame Once turned off motor will not run and gate can be pushed by hand T R O U B L E S H O O T I N G Flip switch up for normal operation Flip switch down to diseng...

Страница 15: ...DEVICE Gate will open when activated by an access control device When timer expires if used gate will close Figure 2 Terminal 5 is safety input Terminals 1 2 and 3 are open inputs DUAL DIRECTION AS E...

Страница 16: ...AC XFMR MOTOR RED YEL YEL BLU ORG 24VDC REQULATED F4 F3 1 AMP DC F1 H BEAT BATTERY LOW AC POWER C O N T R O L B O A R D L AY O U T COMPONENT LOCATIONS Accessory power is 24VDC regulated rated at 500...

Страница 17: ...BER DESCRIPTION 12 MS014 Siren 100 db 13 MS015 Transformer 110 220 VAC 24VAC 14 MS016 Duplex Outlet MS017 Bolt and Nut 4 Reducer 15 MS018 Idler Pulley Bolt Washer and Nut 16 MS019 120 VAC On Off Switc...

Страница 18: ...18 OPERATOR NOTES...

Страница 19: ...erating freely or not on level ground The warranty set forth above is entirely exclusive and no other warranty whether written or oral is expressed or implied LiftMaster inc specifically disclaims any...

Страница 20: ...andard Time 6 00 A M TO 7 00 P M Monday through Friday 8 00 A M TO 4 30 P M Saturday www liftmaster com WHEN ORDERING REPAIR PARTS ALWAYS GIVE THE FOLLOWING INFORMATION PART NUMBER PART NAME MODEL NUM...

Отзывы: