Chamberlain 912GA Скачать руководство пользователя страница 5

5

Connec

t

 Sola

r

 Panel(s) 

t

o Ope

r

a

t

o

r

 Con

tr

ol Box

Open the control box cover. Disconnect all power and batteries from the control board. Run the solar panel cable to the bottom of the control box.
Thread the cable through the watertight connector and pull the cable through until it reaches the 

AC PWR/SOLAR

connector on the control board.

Tighten the watertight connector on the cable. Attach the solar panel wires to 

AC PWR/SOLAR 

input terminal (polarity is not important). Leave the 

AC

PWR/SOLAR 

earth ground connection open. 

NOTE:

The system is designed to run off either the 

AC PWR/SOLAR 

plug-in power adapter (provided with the system) or a separate solar panel, but

not both. The AC Plug-in power adapter wires must be removed before the solar panel wires can be connected. 

Connect the 

AC PWR/SOLAR

connector to the control board. With the batteries still disconnected, the control board should power up if the solar panel

is correctly installed and the sun is shining. This is observed by the 

DIAGNOSTIC

LED blinking.

NOTE:

If the sky is too overcast to allow the solar panel to power up the system, the panel will need to be verified at another time when the sun is

shining. There is no other way to verify the panel installation.

Reconnect the batteries and verify that the operator and all safety devices work correctly. Use the cable ties to secure the solar panel cable away from
places where it could be damaged. Make sure the rubber seal around the cover is intact and close the cover. Insert the four screws for the control box
cover.

AC P

W

R/

SOLAR

J4

Control Board

Red

Black

Solar Panel

POWER WIRING

Содержание 912GA

Страница 1: ...h a single battery A second battery and battery cable can be obtained by purchasing the 922GA battery kit 10WATTSOLARPANEL MODEL912GA Cable Cable Ties 3 Compass Washered nuts 2 Bolt M6 x1 2 Screw 14 x1 2 Solar Panel Solar Panel Mounting Bracket Solar Panel Facing South Control Box To reduce the risk of fire and the risk of SEVERE INJURY or DEATH to persons disconnect electrical power to operator B...

Страница 2: ...ase the number of cycles per day NOTE The solar panel s recommendation is based upon the average solar radiation and the temperature effects on batteries in the given regions Local geography and weather conditions may require additional solar panels Solar panels cannot be installed in areas that experience heavy fog or lake effect rain and snow PREPARATION Select Site for Solar Panel s The solar p...

Страница 3: ...er months when the sun sits lower in the sky TIP Wire runs should be kept as short as possible The solar panel s can be located up to 100 from the operator using 16 AWG wire in any direction including elevating it If a suitable site cannot be found for the panel s please contact Chamberlain to determine if solar is appropriate for this installation Winter Sun Height South Up to 15 Summer Sun Heigh...

Страница 4: ...nd align both bolts Secure Solar Panel s to Solar Bracket Secure solar panel s to solar bracket using two washered nuts Solar Panel Washered Nut Solar Bracket Washered Nut Mount Solar Panel s Assembly Secure solar panel s assembly to mounting surface using appropriate hardware Position Solar Bracket Position solar bracket on mounting surface Mark and drill holes NOTE Solar panel s MUST be installe...

Страница 5: ...ter wires must be removed before the solar panel wires can be connected Connect the AC PWR SOLAR connector to the control board With the batteries still disconnected the control board should power up if the solar panel is correctly installed and the sun is shining This is observed by the DIAGNOSTIC LED blinking NOTE If the sky is too overcast to allow the solar panel to power up the system the pan...

Страница 6: ... run Make sure that no cables or other obstructions are preventing the gate s from moving freely Operator works fine for several weeks or months but then batteries die 1 Batteries not being charged Make sure the solar panel is facing south and free of all obstructions throughout the day Make sure the panel is clean of debris and connected correctly to the control board 2 Operator is over used Cons...

Страница 7: ...7 ...

Страница 8: ... 2008 The Chamberlain Group Inc 01 33936B All Rights Reserved ...

Отзывы: