Chamberlain 912GA Скачать руководство пользователя страница 1

1

CARTON INVENTORY

Verify carton inventory below.

The model 912GA is compatible with Chamberlain

®

Gate Access

Systems GA400D and GA420D. This kit replaces the AC plug-in
supply that is provided with the system.

COMPLETED OVERVIEW

BEFORE STARTING

Make sure the gate operator’s control box has two 12V 7AH batteries installed.

NOTE: 

The GA400D comes with a single battery. A second battery and battery cable can be obtained by

purchasing the 922GA battery kit.

10 WATT SOLAR PANEL

MODEL 912GA

Cable

Cable Ties (3)

Compass

Washered nuts (2)

Bolt M6 x1 (2)

Screw #14 x1 (2)

Solar Panel

Solar Panel
Mounting Bracket

Solar Panel
(Facing South)

Control Box

To reduce the risk of fire and the risk of SEVERE INJURY or DEATH to
persons disconnect electrical power to operator BEFORE proceeding.

ATTENTION

AVERTISSEMENT

AVERTISSEMENT

AVERTISSEMENT

WARNING

CAUTION

WARNING

WARNING

WARNING

PRECAUCIÓN

ADVERTENCIA

ADVERTENCIA

ADVERTENCIA

Содержание 912GA

Страница 1: ...h a single battery A second battery and battery cable can be obtained by purchasing the 922GA battery kit 10WATTSOLARPANEL MODEL912GA Cable Cable Ties 3 Compass Washered nuts 2 Bolt M6 x1 2 Screw 14 x1 2 Solar Panel Solar Panel Mounting Bracket Solar Panel Facing South Control Box To reduce the risk of fire and the risk of SEVERE INJURY or DEATH to persons disconnect electrical power to operator B...

Страница 2: ...ase the number of cycles per day NOTE The solar panel s recommendation is based upon the average solar radiation and the temperature effects on batteries in the given regions Local geography and weather conditions may require additional solar panels Solar panels cannot be installed in areas that experience heavy fog or lake effect rain and snow PREPARATION Select Site for Solar Panel s The solar p...

Страница 3: ...er months when the sun sits lower in the sky TIP Wire runs should be kept as short as possible The solar panel s can be located up to 100 from the operator using 16 AWG wire in any direction including elevating it If a suitable site cannot be found for the panel s please contact Chamberlain to determine if solar is appropriate for this installation Winter Sun Height South Up to 15 Summer Sun Heigh...

Страница 4: ...nd align both bolts Secure Solar Panel s to Solar Bracket Secure solar panel s to solar bracket using two washered nuts Solar Panel Washered Nut Solar Bracket Washered Nut Mount Solar Panel s Assembly Secure solar panel s assembly to mounting surface using appropriate hardware Position Solar Bracket Position solar bracket on mounting surface Mark and drill holes NOTE Solar panel s MUST be installe...

Страница 5: ...ter wires must be removed before the solar panel wires can be connected Connect the AC PWR SOLAR connector to the control board With the batteries still disconnected the control board should power up if the solar panel is correctly installed and the sun is shining This is observed by the DIAGNOSTIC LED blinking NOTE If the sky is too overcast to allow the solar panel to power up the system the pan...

Страница 6: ... run Make sure that no cables or other obstructions are preventing the gate s from moving freely Operator works fine for several weeks or months but then batteries die 1 Batteries not being charged Make sure the solar panel is facing south and free of all obstructions throughout the day Make sure the panel is clean of debris and connected correctly to the control board 2 Operator is over used Cons...

Страница 7: ...7 ...

Страница 8: ... 2008 The Chamberlain Group Inc 01 33936B All Rights Reserved ...

Отзывы: