Model SAJ9 Installation, Operation & Maintenance
File: SAJ9 07-07
I
NSTALLATION
1)
Install a ¼ NPT male quick disconnect coupling in air inlet.. Match to shop fittings.
2)
Place jack assembly on lift rack rails.
O
PERATION
Note:
Before lifting a vehicle, operate the jack through a couple of cycles to become familiar
with the controls.
1)
Roll jack forward before moving vehicle on lift rack. Be sure vehicle is centered on
rack, apply parking brake and chock wheels.
2)
Roll jack(s) to the vehicle manufacturer’s recommended pick-up points. Extend lift
pad arms to proper lift points. Use lift pad spacers if necessary.
3)
Raise jack by pushing on foot pedal on pump.
4)
Raise vehicle to desired height.
5)
Lower jack onto lock.
6)
To lower jack completely, raise off of lock and while holding lock release handle
open lower jack. Push lift pad arms in, remove lift pad spacers (if used). Roll jack
forward before moving vehicle off rack.
M
AINTENANCE
D
AILY
:
Inspect jack and it’s components for damage or excessive wear. Replace parts as
required. See parts list.
D
AILY
:
Inspect air/hydraulic system for leaks.
A
NNUALLY
:
Check hydraulic pump fluid level. When lift pad arms are all the way lowered
remove filler plug and check oil level. Oil should be at top of filler plug hole. Fill
as required with 10 wt, anti foam, anti rust hydraulic oil. Reinstall filler plug.
Hand tighten only.
IMPORTANT!
Failure to keep jack free of corrosive agents and solvents will lead to reduced
service life, which could result in property damage and/or personal injury. If
any problems are encountered, contact your local service representative.
Page 3