Challenger Lifts 4030EAX Скачать руководство пользователя страница 8

Model 4030  

Installation, Operation and Maintenance

 

Rev. 5/22/2019 

4030-IOM-A.doc

 

A

NCHORING

 

15) The anchor bolts must be installed at least 8” 

from any crack, edge, or expansion joint. Also, 
at least 16” from any other lifts hole. 

16) Use a concrete hammer drill with a 3/4-inch 

carbide bit. Tip diameter should conform to 
ANSI Standard B94.12-1977 (.775 to .787). 
Do not use excessively worn bits or bits which 
have been incorrectly sharpened. A core bit 
may be necessary if an obstruction is 
encountered. 

Never substitute with shorter 

anchor. 

17) Drill the anchor holes using the base plate as 

a template. Drill through the floor if possible or 
to a depth of 5 inches minimum. 

18) Vacuum dust from the hole for proper holding 

power. 

19) Shim columns to plumb using the shims 

provided or steel washers.  DO NOT shim 
more than 1/2" at any given point. Use a level 
no less than 24” in length to vertically plumb 
columns. 

20) Assemble washer and nut to anchor with nut 

just below impact section of bolt.  Drive anchor 
into hole until nut and washer contact base.  
Tighten anchor bolts and recheck column for 
plumb.  Re-shim as required.   

21) Torque to 110 foot-pounds to set anchors. 

NOTE: Level bubble should not only be 
between the lines; the bubble should be 
centered between the lines.  If the provided 
shims do not allow sufficient centering of the 
bubble, it is best to lean the rear columns in 
the direction toward each other and the front 
columns in the direction toward each other.

 

22) Install the four cable ends with one flat 

washer, one load nut, and one jam nut. See 
Item's 21, 22, & 23 on page 15.  Pull the 
cables, on until the tension of the cables 
overpowers the springs on the cross beam 
(disengages the locks). The Slack device 
pulley mechanism should be vertical, as 
shown on figure 5. The cables need to be 
inserted on the top hole of the column. Ensure 
the cable is aligned with the cross beam 
sheaves. (Do not put tension on the slack 
device if it is setting on the locks to avoid 
damage).   

23) Install the power unit and the air button valve 

assembly on the power column, 

Fig 10

Fig 10 – Air Button & Power Unit Mounting

 

24) Install  O-Ring  end  of 90-degree hydraulic 

elbow & pipe (6801-LL-06-06 ELBOW 
{pressure port} & 4550K152 0.375 DIA X 1.50 
SCH 80 PIPE MNPT X MNPT) (May need to 
remove plug on the power unit return port to 
install part 4550K152) to power unit.  The 
hydraulic hose is pre-installed to the hydraulic 
cylinder and secured inside the runway.  Pull 
loose end out through the gap between 
runway and cable retaining bar. (Figure G.) 
Pull hoses through the hole on the cross 
beams. Attach a 2500-06-06, 90 degree 
fittings on each hose, then connect hose 
1034-0003 on each of the 90-degree fitting 
done previously. Connect the hose line 
closest to the cylinder rod (The longest hose 
{PRESSURE LINE}) to the 6801-LL-06-06 
fitting on the power unit. Connect 2502-06-06 
3/8 MJIC X 3/8 FNPT 90 ELL to the pipe on 
the power unit 4550K162. Connect the hose 
line closest to the cylinder clevis (shortest 
hose {RETURN LINE}) to the elbow (2502-06-
06) previously connected to the pipe 

Do Not 

Use Teflon Tape or Pipe Dope 

on fittings. 

25) Have a certified electrician connect the power 

unit to a suitable electrical power source as 
shown in 

Fig 15

Содержание 4030EAX

Страница 1: ...unted Lift Model 4030 30 000 lb Capacity 2311 South Park Rd Louisville Kentucky 40219 Email sales challengerlifts com Web site www challengerlifts com Office 800 648 5438 502 625 0700 Fax 502 587 1933...

Страница 2: ...19 5 256 292 Lifting Capacity Hydraulic Pressure at Cap 30 000 lbs 2190 psi Air Supply Required 90 120 psi Clean Dry Motor 3HP Voltage Single Phase Std 230v Rise Time 126 Seconds approximate Min Recom...

Страница 3: ...ed mounting surface could result in unsatisfactory lift performance property damage or personal injury LOCATION This lift has been evaluated for indoor use only with an operating ambient temp range of...

Страница 4: ...06 2 RAMP ASSEMBLY 6 7430 0367 2 FRONT WHEEL STOP 7 7430 0506 2 WHEEL CHOCK 8 AB 100157 1 POWER UNIT 9 9430 0308 1 POWER RUNWAY ASSEMBLY 10 8430 0334 1 IDLE RUNWAY ASSEMBLY 11 8430 0334 1 IDLE RUNWAY...

Страница 5: ...les 3 and 4 should be extending out from the rear of the power runway and cables 1 and 2 from the front of the power runway Fig 5 4 Position the front and rear cross beams Fig 5 5 Feed Cable 3 through...

Страница 6: ...Model 4030 Installation Operation and Maintenance 6 Rev 5 22 2019 4030 IOM A doc Fig 6 Cross Rail Assembly...

Страница 7: ...1 4 SIDE TO SIDE TO BE IDENTICAL Fig 7 Final Runway Positioning 9 Center cross beam bolts with slots in runway and tighten Be careful not to move runways 10 Bolt the runways as shown in Figure I Repe...

Страница 8: ...flat washer one load nut and one jam nut See Item s 21 22 23 on page 15 Pull the cables on until the tension of the cables overpowers the springs on the cross beam disengages the locks The Slack devi...

Страница 9: ...mn top plate For alignment style runways use a transit for leveling runways placing the target in the center of the turn plate with lift lowered into locks adjusting the lock ladders as needed Refer t...

Страница 10: ...ch column COLUMN DECAL PLACEMENT 39 Center the decal on the front drivers side column and rear passenger side column 40 Apply decal 4 from top of columns Fig 13 Fig 13 Decal Placement ALIGNMENT RUNWAY...

Страница 11: ...the lift inspectors are qualified and that they are adequately trained in the inspection of the lift The Owner Employer shall establish procedures to periodically maintain the lift in accordance with...

Страница 12: ...NY SAFETY FEATURE IN AN ATTEMPT TO LOWER THE LIFT JACK NO GO ZONE DO NOT PLACE ROLLING JACKS WITHIN 50 INCHES FROM THE CENTER OF THE RUNWAY MAINTENANCE To avoid personal injury permit only qualified p...

Страница 13: ...Model 4030 Installation Operation and Maintenance 13 Rev 5 22 2019 4030 IOM A doc Parts Breakdown Fig A General Layout...

Страница 14: ...8 15 9430 0306 2 RAMP ASSY 16 7430 0367 2 FRONT STOP 17 9600K223 2 GROMMET FITS 1 3 4 HOLE 18 AB 100157 1 POWER UNIT 19 8430 0322 4 LOCK LADDER 20 94895A842 8 7 8 9 ZC YW CHROME PLT STEEL HEX NUT GR8...

Страница 15: ...X 1032 0007 CABLE 2 5 8 XFX XAX 3 1032 0006 1 CABLE 3 5 8 4 1032 0005 1 CABLE 4 5 8 5 94895A858 4 1 1 8 12 HEX NUT ZC GR 8 6 93839A585 4 1 1 8 12 THIN HEX NUT ZC GR 8 7 98023A039 4 1 1 8 ID WASHER ZC...

Страница 16: ...D CONNECTOR CABLE RETAINER 9 91257A573 4 1 4 28 2 75 LENGTH CAP SCREW 10 7430 0424 1 CABLE CONNECTOR 9430 0308 1 MAIN ALIG TRACK ASSY 11 7430 0459 1 ANTI ROTATING BAR 12 91257A571 2 1 4 28 4 0 LENGTH...

Страница 17: ...Model 4030 Installation Operation and Maintenance 17 Rev 5 22 2019 4030 IOM A doc PARTS BREAKDOWN continued Fig D Cross Beam...

Страница 18: ...AA508 9 4 BEARING 16 91259A626 4 5 16 18 1 25 LENGTH SHOULDER SCREW 17 90126A031 8 3 8 SCREW SIZE ZC PLT WASHER 18 92979A118 16 1 4 20 3 4 HEX CAP SCREW GR 5 19 7430 3003 4 CROSS RAIL COVER 20 1004 0...

Страница 19: ...6 1 1 4 MNPT X MALE PNEUMATIC HOSE PLUG 8 SPL 6002 1 1 4 MNPT X 3 8 90 DEGREE PUSH ON FITTING 9 PT23003BK 63FT 5 32 DIA PLASTIC AIR LINE 10 SPL 2501 1 1 8 MNPT X 5 32 90 DEGREE PUSH ON FITTING 11 5078...

Страница 20: ...Model 4030 Installation Operation and Maintenance 20 Rev 5 22 2019 4030 IOM A doc NOTES...

Отзывы: