![Chaffoteaux & Maury Mira System CF Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/chaffoteaux-and-maury/mira-system-cf/mira-system-cf_installation-and-operating-manual_2585820006.webp)
6
Fig. 8
1
2
Fig. 7
A
A
- place the paper installation jig in the selected position on the wall
- fit the hanging bracket
- bring the water pipes and the electrical connection to the locations shown on the fitting template
- remove the 2 locking screws
A
which secure the front panel (fig. 7)
- remove the front panel
- offer the boiler up to its bracket and allow it to drop into position while pressing on it (fig. 8)
- ensure water and gas connections using the various seals required (rubber seal for gas) and position the metal filter in the
heating backflow connection.
Safety valve drain hole
16
MUST be connected to a waste water pipe.
finish by connecting the chimney:
- use a connecting pipe or elbow specially approved for gas (99.5 % pure aluminium or stainless steel)
- connection is provided to fit the pipe or elbow inside the outlet neck of the boiler's draught diverter
Cleaning the appliance
Once the water has been connected, it is essential to clean the installation with an appropriate product (dispersing agent) to
remove filings, solder, and various factory oils and greases.
The use of any solvent or aromatic agent (petrol, oil etc.) is forbidden.
We recommend treating the whole heating system as soon as it is commissioned to maintain a pH between
9 and 9.5.
5. Fitting the boiler
31
. Central heating flow isolating valve and tank
32
. Tank backflow (system plus)
33
. Gas service tap
34
. Cold water supply
35
. Central heating return isolating valve
16
Fig. 9
31
32
33
35
34