![Chad Valley 367/5511 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/chad-valley/367-5511/367-5511_assembly-and-user-instructions_2585632008.webp)
Step 7
F r o m p o i n t 3 6 , c o u n t b a c k
9 holes on the Top Rail and
Triangle-Rings, you should be
at point 9. Attach a spring at this
point, as shown in FIGURE 8.
Step 8
Count another 9 holes from point
18 on the Top Rail and Triangle-
Rings, you should be at point
27. Attach a spring at this point,
as shown in FIGURE 9. At this
point in assembly, you should
have 4 springs install at ZERO,
9, 18 and 27.
T h i s e v e n d i s b u r s e m e n t o f
tension is critical to proper
assembly of the rest of the
trampoline mat as shown in
FIGURE 9.
18
27
9
ZERO
1
TRAMPOLINE MAT
9
18
ZERO
1
TRAMPOLINE MAT
FIGURE 8
FIGURE 9
7
Assembly Instructions