![CG Emotron VS30 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/cg/emotron-vs30/emotron-vs30_mounting-and-switch-on-instruction_2585394019.webp)
19
Commissioning
Initial switch-on / functional test
5
Carrying out the functional test
1.
Start drive:
1.
Enable inverter: X3/DI1 = HIGH.
2.
Activate preset setpoint 1 (20 Hz) as speed setpoint: X3/DI4 = HIGH.
The drive rotates with 20 Hz.
3.
Optional: activate the function for the reversal of rotation direction.
a)
X3/DI3 = HIGH.
The drive rotates with 20 Hz in the opposite direction.
b)
Deactivate the function for the reversal of rotation direction again: X3/DI3 = LOW.
Speed characteristic (example)
DI1
AI1 [V]
10
0
DI4
Inverter enabled
Speed setpoint selection via X3/AI1 active
t (In
this example X3/AI1 is connected to GND)
t
Preset frequency setpoint 1 active
DI3
t
Invert rotation
t
f
set
[Hz]
50
20
0
-20
2.
Stop drive:
5 s
5 s
Preset frequency setpoint 1 (20
Hz)
t
1.
Deactivate preset setpoint 1 again: X3/DI4 = LOW.
2.
Inhibit inverter again: X3/DI1 = LOW.
The functional test is completed.
The commissioning process of the drive solution is described in a separate commissioning instruc-
tion which can be found on the Internet in our download area:
services-support/file-archive/
Содержание Emotron VS30
Страница 1: ...Emotron VS30 AC drive 4 10 hp Use in UL approved systems Mounting and switch on instruction...
Страница 2: ...2 This page intentionally left blank...
Страница 4: ...4 This page is intentionally left blank...
Страница 10: ...10 4 Mounting Mechanical installation 4 2 Mechanical installation Dimensions 4 7 5 hp All Dimensions in inches...
Страница 11: ...11 Mounting Mechanical installation 4 Dimensions 10 hp All Dimensions in inches...
Страница 23: ......