17
Commissioning
Important notes
5
5
Commissioning
5.1
Important notes
Incorrect settings during commissioning may cause unexpected and dangerous motor and system
movements.
Possible consequence: death, severe injuries or damage to material assets
▶
Clear hazardous area.
▶
Observe safety instructions and safety clearances.
5.2
Before initial switch-on
Prevent injury to persons and damage to material assets. Check the following before switching on the
mains voltage:
•
Is the wiring complete and correct?
•
Are there no short circuits and earth faults?
•
Is the motor circuit configuration (star/delta) adapted to the output voltage of the inverter?
•
Is the motor connected in-phase (direction of rotation)?
•
Does the "emergency stop" function of the entire plant operate correctly?
WARNING!
Содержание Emotron VS30
Страница 1: ...Emotron VS30 AC drive 4 10 hp Use in UL approved systems Mounting and switch on instruction...
Страница 2: ...2 This page intentionally left blank...
Страница 4: ...4 This page is intentionally left blank...
Страница 10: ...10 4 Mounting Mechanical installation 4 2 Mechanical installation Dimensions 4 7 5 hp All Dimensions in inches...
Страница 11: ...11 Mounting Mechanical installation 4 Dimensions 10 hp All Dimensions in inches...
Страница 23: ......