2
1.1.1 Inspection of unit
Inspect the UPS upon receipt for visible damage. If damaged please keep the original
box and packaging and notify the carrier/dealer immediately.
1.1.2 Unpacking the cabinet
To unpack the system:
1.
Open the outer carton and remove the accessories packaged with the UPS.
2.
Carefully lift the cabinet out of the outer carton and set it on a flat, stable surface.
3.
Discard or recycle the packaging in a responsible manner or store it for future use.
1.1.3 UPS Setup
All 400R series are designed for tower and rack configurations. They can be installed
into a 19” server rack. Please follow the instruction for Tower setup and Rackmount
setup.
Tower setup
This series of UPS can be placed both horizontally and vertically. For a tower
configuration UPS stands are provided to stabilise the UPS when positioned vertically.
The UPS stand must be attached to the bottom of the tower using the following
procedure.
1.
Slide down the UPS vertically and put two UPS stands at the end of the tower.
2.
Place down the UPS into two stands carefully.
3.
Pull out the LCD box and rotate it in a clockwise direction to 90 degree and then
push it back in the front panel.
Содержание C400R-010-B
Страница 7: ...3 ...