CertainTeed 48P-6-19 Скачать руководство пользователя страница 4

4 | 

P a g e

 

 

GENERAL 

 

 

This introduction is presented to provide a basic description of the function and purpose 

of the VAC-MATIC

TM 

19 insulation vacuum machine. 

 

The  VAC-MATIC

TM 

19  is  principally  designed  to  vacuum  damaged  or  contaminated 

insulating  materials  generally  used  for  attic  insulation.    The  VAC-MATIC

TM

  19  can  also  be 

configured  for  wall  spray  applications  to  return  scrubbed  or  recycled  material  to  a  blowing 

machine for remix into new material.  Whenever you do a wall spray application with the VAC-

MATIC

TM

 19 machine, the insulation manufacturer’s instructions prevail since they guarantee the 

final results. 

 

When vacuuming damaged material, the VAC-MATIC

TM 

19 is normally placed so the hose 

connected to the inlet port can reach the end of the job. The damaged material can be vacuumed 

into  a  bag connected  directly  to  the  outlet  port  or  hose  that  is  connected  to  the outlet  port 

leading  to  a  dumpster  or  other  form  of  containment.  When  vacuuming  insulation  for  wall 

spraying, the VAC-MATIC

TM

 19 is normally located half way between the point of application and 

the  blowing  machine  is  generally  connected  to  a  filtering  housing  or  material  deflector  that 

directs material back into the hopper. 

 

 

BEFORE YOU RUN THIS MACHINE…. 

PLEASE STUDY THE REST OF THIS MANUAL. 

 

Please contact our sales department at 800-237-7841 for any optional accessories such as; hose, 
sleeves, clamps, and material containment bags.

 

 

Содержание 48P-6-19

Страница 1: ...INSULATION VACUUM MACHINE PLEASE READ THIS MANUAL THOROUGHLY BEFORE PUTTING THE VAC MATICTM 19 INSULATION VACUUM MACHINE INTO SERVICE MANUFACTURED BY CertainTeed Machine Works 101 Hatfield Rd Winter Haven Florida 33880 1 800 237 7841 www certainteedmachineworks com ...

Страница 2: ...2 P a g e TABLE OF CONTENTS SPECIFICATIONS 3 GENERAL 4 SAFETY 5 6 OPERATION 6 7 PREVENTIVE MAINTENANCE 8 10 PARTS DRAWING 11 ...

Страница 3: ...CATIONS MODEL 48P 6 19 Six inch inlet and outlet ports ALL MACHINES Kohler gasoline engine 19 horsepower single cylinder air cooled 350 CCA battery heavy duty housing and fan impeller HEIGHT 43 00 inches LENGTH 42 00 inches WIDTH 35 00 inches WEIGHT 364 pounds ...

Страница 4: ... final results When vacuuming damaged material the VAC MATICTM 19 is normally placed so the hose connected to the inlet port can reach the end of the job The damaged material can be vacuumed into a bag connected directly to the outlet port or hose that is connected to the outlet port leading to a dumpster or other form of containment When vacuuming insulation for wall spraying the VAC MATICTM 19 i...

Страница 5: ...m the inlet port 2 You should always attach the vacuum hose to the front cover 3 by lifting the door and securing the hose with a clamp to the inlet port before you start the machine You will see the following label on this door WARNING IF ANY FOREIGN OBJECT SHOULD ENTER THE MACHINE SHUT DOWN THE ENGINE AND REMOVE THE KEY FROM THE IGNITION BEFORE RETRIEVING THE OBJECT NEVER REACH INTO THE MACHINE ...

Страница 6: ...uum machine Never leave the machine unattended during operation CERTAINTEED MACHINE WORKS RECOMMENDS THAT THE OPERATOR S WEAR PROPER SAFETY EQUIPMENT SUCH AS EYE AND EAR PROTECTION AS WELL AS AN APPROVED DUST MASK WHEN OPERATING THE VAC MATICTM 19 INSULATION VACUUM MACHINE OPERATION 1 Make sure vacuum is free of foreign objects 2 Fill fuel tank with clean grade fuel and check engine oil 3 Make sur...

Страница 7: ...FACE OPERATING THE MACHINE WHEN IT IS NOT LEVEL COULD LEAD TO ENGINE FAILURE OR THE MACHINE TIPPING OVER UPON COMPLETION OF THE JOB 1 Make sure vacuum hose is empty 2 Move throttle to slow position and allow engine to run for several minutes 3 Turn engine off 4 Wait for machine to completely stop rotating 5 Remove hoses and or containment bag from machine WARNING NEVER REPLACE A CONTAINMENT BAG WH...

Страница 8: ...peration of the VAC MATICTM 19 machine keep the engine vacuum housing and impeller clean of debris build up Keep inlet safety door in good working condition For any replacement of the impeller use the following steps 1 Remove front cover 3 from vacuum housing 4 2 Remove washer and bolt 5 from engine shaft 3 Remove the three bolts from the center bushing 6 4 Insert two of the bolts in the threaded ...

Страница 9: ...t pounds Do not overtighten the bushing shoulder and impeller hub face 7 Add attach washer 10 lock washer and bolt to the end of engine shaft and torque to 30 foot pounds 8 Add cover back on housing and tighten all nuts Pillow Block Bearings Bearings should be lubricated every month of operation Do not over lubricate One or two pumps from a hand operated grease gun is sufficient Belts Do not use b...

Страница 10: ...10 P a g e ...

Страница 11: ...11 P a g e ...

Отзывы: